BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Wildwood, Florida. Completed plans call for site work for a water / sewer project.

**As of September 14, 2021, the anticipated construction start date and completion are not yet determined at this time. The City will consider all bids properly submitted at its scheduled Bid Opening. The City of Wildwood shall be the sole judge of the bid and the resulting agreement that is in its best interest and its decision shall be final. All work for the Project shall be constructed in accordance with the Drawings and Specifications prepared by the Engineer. Bids shall be submitted for furnishing, delivering and installing all materials, equipment, and services, including labor for the Work, which generally involves the following activities: Construction of approximately 2790 LF of 12" PVC water main from the intersection of CR 219 and CR 238 west to the approximate intersection of CR 219 and CR 44A. Construction of approximately 2680 LF of 12" PVC water main from the intersection of CR 219 north and CR 44A to the approximate intersection of CR 44A and CR 213. Construction of approximately 2590 LF of 8" PVC water main from the intersection of CR 44A and Orange Street to the approximate intersection of CR 44A and CR 213. Construction of approximately 2705 LF of 8" PVC water main and 32 LF of 8" DIP water main from the intersection of CR 213 and CR 238 to the approximate intersection of CR 213 and CR 44A Project No: 20-1729.49 Furnish all necessary labor, materials, and equipment to perform color audio-video recording of the project site surfaces as specified herein. Contractor shall furnish to the Engineer and Owner an original copy of a continuous color audio-video DVD recording of each project segment. The Owner reserves the right to reject the audio-video DVD because of poor quality, unintelligible audio or uncontrolled pan or zoom. Any video rejected by the Owner shall be re-videoed at no additional cost to the Owner. The Contractor shall submit two (2) DVD to the Engineer for format and content approval prior to the start of any work.

Award

Water / Sewer

$1,347,788.00

Public - City

Site Work

38

15

2

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
71
Bidding Soon
1,344
All Active Projects
577
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2021

November 1, 2021

img_map_placeholder

Co Rd 209, Wildwood, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.