BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Anaheim, California. Completed plans call for site work for a water / sewer project.

The electronic proposals shall be tabulated by the Anaheim City Engineer and the results thereof reported to the City Council for consideration at a meeting to be held no later than 45 days after the bid opening. It shall be mandatory upon the contractor to whom the contract is awarded, and upon any subcontractor under them, to pay not less than the higher of the two rates contained in the current general prevailing wage rate(s) and per diem rate(s), established by the Director of the Department of Industrial Relations of the State of California, (as set forth in the Labor Code of the State of California, commencing at Section 1770 et seq.), or by the Secretary of Labor (as set forth in Davis-Bacon Act, 40 U.S.C. 267a, et seq.). Said prevailing rates of wages are available on the following electronically. The successful bidder(s) shall be required to enter into a contract with the City of Anaheim, in a form approved by the Anaheim City Attorney. The City Council reserves the right to reject any and all bids or to waive any informality to the extent permitted by law and reserves the further right to make an award to the lowest responsible bidder found and determined to serve the best interests of the City of Anaheim. Liquidated Damages $500/day until August 14, 2022, $1,000/day starting August 15, 2022. Capped at $200,000 total License Requirements A and C-57 Online Q&A Yes Q&A Deadline 09/08/2021 2:00 PM (PDT) The Contractor shall be responsible for construction, and completion of the work as shown on the Plans and specified herein. The work shall be coordinated, scheduled and pursued so the project is not delayed and the time duration is not extended (see Section 1-04.03). The Contractor shall furnish all labor, materials, methods or processes, implements, tools, and machinery necessary for the construction, testing, and completion of the work, and to leave the construction site in a neat, clean, and orderly condition. The Contractor shall furnish all labor, materials, methods or processes, implements, tools, and machinery necessary for the construction, testing, and completion of the work, and to leave the construction site in a neat, clean, and orderly condition.

Award

Water / Sewer

$6,047,736.00

Public - City

Site Work

8

10

24

7

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
227
Active Projects
98
Bidding Soon
2,305
All Active Projects
1,017
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2021

November 15, 2021

img_map_placeholder

To Be Determined, Anaheim, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.