Demolition, site work, paving and new construction of a civil project in Randolph, Nebraska. Completed plans call for site work for a water / sewer project; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.
Contract Award Date: Mar 01, 2022 Contract Award Number: W9128F22C0008 Task/Delivery Order Number: Contractor Awarded Unique Entity ID (DUNS): 968786520 Contractor Awarded Unique Entity ID (SAM): SSL9LF1Z6LM6 Contractor Awarded Name: Iron Mike Construction Llc Contractor Awarded Address: Centennial, CO 80112-3922 USA Base and All Options Value (Total Contract Value): $7996440.40 The flood risk reduction project is along the Middle Logan Creek inA Randolph, Nebraska. The work reach extends fromA approximately 550-feetA upstream of County Line Road (558th Ave) to 150 feet upstream of SholesA Road bridge. The work in general comprises: 1) Earthwork/grading for the realigned and widened Middle Logan Creek channel -excavating existing channel to a widened channel bottom of 40 feet with 95-foot top width, 3:1 side slopes, and a 5-foot wide and 1-foot deep low flow channel. 2) Transition from natural channel approximately 400 feet upstream of 558th Ave bridge to the trapezoidal widened channel section. 3) Channel improvements with erosion and grade control, placement of new riprap, and other erosion control include turf reinforcement mat, seeding, erosion control blanket, silt fence, etc. 4) New and extended storm drain structures. 5) Removal and replacement of Main St., Douglas St., and 558th Ave bridges. 6) Removal of a 42-foot long pedestrian bridge, not to be replaced. 7) Horizontal roadway realignment for Main St. bridge and vertical roadway realignment for the approaches to Main St., Douglas St. and 538th Ave bridge. 8) Shoo flybridge detour for 558th Ave bridge construction. 9) New 3 strand barb wire fencing, new concrete pavement, and new aggregate pavement; and 10) Installation of a new sanitary sewer siphon system and four domestic waterlines. Site Visit has been scheduled for Tuesday, 27 July 2021 at 10:00 am local time. Participants will meet at 212 East Broadway, Randolph, NE (City Offices of Randolph). Contractors interested in seeing the site need to make reservation with Todd Tobias telephone (402) 650-0358 or by e-mail at Todd.R.Tobias@usace.army.mil. The flood risk reduction project is along the Middle Logan Creek in Randolph, Nebraska. The work reach extends from approximately 550-feet upstream of County Line Road (558th Ave) to 150 feet upstream of Sholes Road bridge. The work in general comprises: 1) Earthwork/grading for the realigned and widened Middle Logan Creek channel - excavating existing channel to a widened channel bottom of 40 feet with 95-foot top width, 3:1 side slopes, and a 5-foot wide and 1-foot deep low flow channel. 2) Transition from natural channel approximately 400 feet upstream of 558th Ave bridge to the trapezoidal widened channel section. 3) Channel improvements with erosion and grade control, placement of new riprap, and other erosion control include turf reinforcement mat, seeding, erosion control blanket, silt fence, etc. 4) New and extended storm drain structures. 5) Removal and replacement of Main St., Douglas St., and 558th Ave bridges. 6) Removal of a 42-foot long pedestrian bridge, not to be replaced. 7) Horizontal roadway realignment for Main St. bridge and vertical roadway realignment for the approaches to Main St., Douglas St. and 538th Ave bridge. 8) Shoo flybridge detour for 558th Ave bridge construction. 9) New 3 strand barb wire fencing, new concrete pavement, and new aggregate pavement; and 10) Installation of a new sanitary sewer siphon system and four domestic waterlines. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The estimated magnitude of construction is between $5,000,000 and $10,000,000.
Award
Water / Sewer
$7,996,440.00
Public - Federal
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 20, 2021
October 19, 2021
Multiple Locations, Randolph, NE
Related To This Project
Randolph, NE
Bid Date: Mar 17 2022
Omaha, NE
Bid Date: Mar 02 2022
Omaha, NE
--
Elkhorn, NE
Bid Date: Feb 15 2022
Cozad, NE
Bid Date: Mar 03 2022
Milford, NE
Bid Date: Mar 03 2022
Hastings, NE
Bid Date: Mar 03 2022
Omaha, NE
Bid Date: Mar 02 2022
Pierce, NE
Bid Date: Mar 02 2022
Ashland, NE
Bid Date: Mar 04 2022
Omaha, NE
Bid Date: Mar 04 2022
Gretna, NE
Bid Date: Mar 04 2022
Omaha, NE
Bid Date: Mar 02 2022
Bellevue, NE
Bid Date: Mar 04 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.