BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Glendale, California. Contact the soliciting agency for additional information.

General Scope of Work: Except for those materials to be provided by the City (as specified in the Technical Specifications), Contractor shall furnish labor, materials, equipment, services, and specialized skills to perform work involved in the Project. The Work included in the Bid is defined in the Project Drawings and Specifications and will generally include industrial Reconstruction of Feeder for 12 kV Operation, which will be authorized on a Task Order basis. Pre-Bid Conference: There will not be a pre-bid conference. Please submit questions to Catherine Babakhanlou, Project Manager. Bidder satisfactorily completed as a prime contractor or subcontractor at least five (5) prevailing wage public contracts in California Directors Estimate. An estimate of the preliminary cost of this Work has been prepared. The estimate is in the range of $ 3,000,000 to $4,000,000. The City does not guarantee any minimum quantity of Work. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This Work must be completed within three hundred and sixty-five days (365) calendar days from the Date of Commencement as established by the Citys written Notice to Proceed. The City reserves the right to reject any and all Bids, to award all or any individual part/item of the Bid, and to waive any informalities, irregularities or technical defects in such Bids and determine the lowest responsible Bidder, whichever may be in the best interests of the City. No late Bids will be accepted, nor will any oral, facsimile or electronic Bids be accepted by the City. At the time of the Bid Deadline and at all times during performance of the Work, including full completion of all corrective work during the Correction Period, the Contractor shall be licensed in accordance with the provisions of Chapter 9, Division III, of the Business and Professional Code of the State of California. A General Contractors A license is required.

Post-Bid

Municipal

$4,000,000.00

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
100
Bidding Soon
2,214
All Active Projects
976
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2022

March 23, 2022

img_map_placeholder

Multiple Locations, Glendale, CA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.