BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a playground / park / athletic field in Morro Bay, California. Completed plans call for the renovation of a playground / park / athletic field.

As of June 6, 2023, construction is underway and expected to be completed by the end of June, 2023, however, an exact timeline for construction has not been confirmed. General work description: The work shall include, but is not limited to, providing all tools, materials, labor, equipment, and incidentals necessary for the removal and replacement of a bus shelter, sidewalk, driveway approach, curb ramp, spandrel, fencing, bike rack, lighting, irrigation, sign and pavement restoration. All utilities not replaced will be protected in place including manholes and returned to their prior condition. The work will also include any required traffic control, signage, public notifications, stormwater control, shoring, formwork, and all other work necessary to render the infrastructure/facility complete and operational, as shown on the Project Plans and Specifications, as specified herein, and in accordance with City of Morro Bay Standard Specifications and Drawings, Caltrans Standard Specifications, and Greenbook with whichever is more restrictive applying if a conflict arises. City will publicize the engineer'=s estimate for the base bid falls within a range of $300,000 to $400,000 Requests for information or clarification and any questions must be submitted IN WRITING and received in the Department of Public Works no later than 5:00 p.m. on Thursday, January 5, 2023. Requests may be submitted via e-mail addressed to: Pamela Newman, Associate Engineer, at pnewman@morrobayca.gov. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Under Construction

Playgrounds / Parks / Athletic Fields

$291,270.00

Public - City

Renovation

18

16

2

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
14
Bidding Soon
208
All Active Projects
90
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2023

February 13, 2023

img_map_placeholder

To Be Determined, Morro Bay, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.