Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, asbestos abatement and renovation of a mixed-use development in New York, New York. Completed plans call for the renovation of a medical facility; for asbestos abatement for a medical facility; and for site work for a medical facility.
The scope of the design-build project 630A4-10-401 Renovation of Patient Wards 15W consists of the design and construction of a drug and substance abuse ward (15 W) at the VA Brooklyn Medical Center. Work will include, but is not limited to, the architectural, asbestos remediation, electrical, mechanical, plumbing, lighting, security, and sprinkler upgrades to patient ward 15 W 630A4-10-401 RENOVATE PATIENT WARD 15W DESIGN BUILD, NEW YORK HARBOR HEALTHCARE SYSTEM, BROOKLYN CAMPUS This is a TWO-PHASE DESIGN BUILD ACQUISITION - ALL Qualified Offerors may submit for Phase I. After Phase I evaluation, selected Phase II Offerors will be notified for Phase II submission. Provide turnkey services to include all labor, materials, equipment, and supervision necessary to design and construct the project in accordance with VA design requirements and scope of work. The NAICS code for this procurement is 236220 and the size standard is $39.5 million. Per FAR 36.204, the magnitude of construction is between $2,000,000 and $5,000,000 This a Total Service-Disabled-Veteran-Owned- Small-Business(SDVOSB) Procurement. Potential contractors must be registered in Beta SAM (www.beta.sam.gov), VetBiz (www.vetbiz.gov) and US Department of Labor for 412 report at the time of offer submission and during the award of this procurement. VA is providing old design documents for this project that the awarded contractor is required to update and provide a complete, 100% final design before proceeding into construction. Issuance of Pre-Solicitation Notice: 09/07/2022 4:30 PM Issuance of RFP for Phase 1 Proposals: 09/28/2022 4:30 PM WALK-THROUGH: 10/11/2022 11:30 AM - MEET AT ENGINEERING CONFERENCE ROOM - BUILDING IV, ROOM: G-16 RFP Response Date: 10/25/2022 4:30 PM - BY EMAIL ONLY - Vladimir.Stoyanov@VA.GOV Technical Review and Evaluation of Phase 1 Proposals: 11/08/2022 4:30 PM Issuance of Request for Phase 2 Proposals: 11/22/2022 4:30 PM Phase 2 Proposal Response Date: 12/06/2022 4:30 PM - BY EMAIL ONLY - Vladimir.Stoyanov@VA.GOV Technical Review and Evaluation of Phase 2 Proposals: 12/20/2022 4:30 PM Contract Preparation, Review, and Clearance: 12/29/2022 4:30 PM Estimated/Anticipated Contract Award: 12/31/2022 4:30 PM SUBMITTALS AND RFI's: not to exceed 90 calendar days from NTP MOBILIZATION AND ID ISSUANCE: not to exceed 30 calendar days from the item above SAFETY TRAINING: not to exceed 2 calendar days from the item above ALL OTHER WORK (DESIGN AND COINSTRUCTION): not to exceed 225 calendar days from the item above CLOSE-OUT AND PUNCHLIST: not to exceed 3 calendar days from the item above Contractor MUST complete the design AND construction in 350 calendar days (POP) from receipt of Notice to Proceed. ALL OFFERORS MUST REVIEW ALL ATTACHEMENTS PRIOR TO PROPOSING ALL OFFERORS MUST ATTEST TO AND ANSWER ALL QUESTION OF THE SOLICITATION AWARD IS SUBJECT TO AVAILABILITY OF FUNDS 10 The Offeror may submit any questions with regard to this report by email to NDAA1290Cert@state.gov. To the extent feasible, the Department of State will respond to such email inquiries within 3 business days. Design of 15 W ward using VA TIL as the baseline for requirements. The contractor is to be provided Asbestos Survey but needs to take samples to verify existing quantities. The contractor is to perform all abatement during construction. Off Hours work as required to minimize disruptions to the facility. The contractor is responsible for all terminations on both ends of all IT cabling, equipment, and ports being installed. Contractors working on site must be compliant with Privacy training. When coming on-site, all contractors must read and sign "VA Privacy Training for Personnel without Access to VA Computer Systems or Direct Access or Use to VA Sensitive Information" a signed copy of the training will be provided and maintained by the COR. This training needs to be completed annually. Coordination with VA security contractor for all security requirements. Contractor to own providing Newforma or similar site for the submittal review process. The contractor is to provide an independent commissioning agent. The contractor owns all responsibility for both the design and construction of the project in order to meet VA specs and requirements. MBE (22.6%), WBE (6.9%), DVBE (100%) RFI Submittal Date: 10/21/2022 04:00 Pm - by Email Only - Vladimir.stoyanov@va.gov Technical Review and Evaluation of Phase 1 Proposals: 11/18/2022 4:00 PM Issuance of Request for Phase 2 Proposals: 11/25/2022 4:00 PM Phase 2 Proposal Response Date: 12/09/2022 4:00 PM - BY EMAIL ONLY - Vladimir.Stoyanov@VA.GOV Technical Review and Evaluation of Phase 2 Proposals: 12/16/2022 4:00 PM Contract Preparation, Review, and Clearance: 12/22/2022 4:00 PM Estimated/Anticipated Contract Award: 12/30/2022 4:00 PM *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Medical
$5,000,000.00
Public - Federal
Asbestos Abatement, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 4, 2022
December 31, 2022
800 Poly Pl, New York, NY
Related To This Project
New York, NY
Bid Date: Nov 04 2022
New York, NY
Bid Date: Oct 14 2022
New York, NY
Bid Date: Nov 28 2022
New York, NY
--
New York, NY
Bid Date: Nov 07 2022
New York, NY
Bid Date: Dec 02 2022
New York, NY
Bid Date: Oct 26 2022
New York, NY
Bid Date: Aug 18 2022
New York, NY
Bid Date: Aug 18 2022
New York, NY
--
New York, NY
Bid Date: Dec 02 2022
New York, NY
--
New York, NY
Bid Date: Oct 14 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.