BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Avondale, Arizona. Working plans call for the construction of a 15,000-square-foot fire / police facility; for site work for a fire / police facility; and 19,000-square-foot fire / police facility.

The City of Avondale has contracted with Design Consultants to design and to perform construction administration for the Avondale Police Detention Center and Fire Station. The City has determined that the Construction Manager at Risk (CMAR) alternative delivery method would be the best method in selecting a Construction Manager. The Construction Manager will provide the services in a two-phase approach, preconstruction and construction, as listed below. The Construction Manager may prepare more than one Guaranteed Maximum Price ("GMP") proposal for services to ensure the project is within budget and on schedule. The Construction Manager will provide the Services described in Construction Manager at Risk Agreement. The Avondale Police Detention Center and Fire Station will be located at the northeast corner of 10th Street and Western Avenue. The project will consist of a new, approximately 15,000 SF, police facility combined with an approximately 19,000 SF fire station The anticipated date for “Notice of Short List” has been revised to “October 26, 2021” Final Date for Inquiries: September 27, 2021 Notice of Short List: September 30, 2021 Anticipated Date for Interviews: November 3, 2021 Notice of Intent to Award: November 3, 2021 Anticipated Award Date: December 1, 2021 Estimated Design Start: October 1, 2021 or sooner The City reserves the right to review any and all of the insurance policies and/or endorsements cited in this Agreement but has no obligation to do so Cost of premiums for normal and customary Construction Manager's Subcontractor default insurance at the rate of 1.25% of the cost of subcontracts and Subcontractor's liability, workman's compensation and builders risk insurance as required pursuant to Article 10 below, which shall be identified as separate line items within the applicable GMP. If the Construction Manager intends to utilize Subcontractor Liability Wrap-up Coverage (Z-25), it will be reimbursed at the rate of 1.5% of the Subcontract amount, and credited from the Subcontractor bids. Commercial General Liability Insurance shall be reimbursed at the rate of 1.1% of the applicable GMP amount; Builders Risk Insurance shall be reimbursed at the rate of 0.47% of the applicable GMP amount; Performance and Payment Bonds shall be reimbursed at 0.76% of the applicable GMP amount. All amounts shall be identified as separate line items within the applicable GMP. (highlighted percentages are examples and may be negotiated) Shortlist Confirmed.

Final Planning

Fire / Police

$16,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

66 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
23
Bidding Soon
684
All Active Projects
275
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 11, 2021

December 2, 2021

img_map_placeholder

Multiple Locations, Avondale, AZ


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.