EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 9, 2022 at 8:00 PM

Updated September 15, 2023

Site work, paving and new construction of a mixed-use development in North Charleston, South Carolina. Completed plans call for the construction of a military facility.

Title: FLETC Training Venue Replication Location of the work: FLETC Training Delivery Point, Charleston, South Carolina Project Number: CHSTVR2022 Description of the Work: The project scope of work includes all supervision, labor, tools, materials, transportation, equipment, and other services necessary for the replication of training venues (including overall site development, construction of three buildings, Skid Pad, Driving Range, streets, parking lots, landscaping, and security fencing) in accordance with the completed A&E design at the Federal Law Enforcement Training Centers, Charleston, South Carolina. The Government anticipates awarding a Task Order using the NMACC multiple-award IDIQ contract. As described in FAR 16.505(b)(1)(ii) each contractor will be provided with a fair opportunity to be considered for award. Specifications: Charleston Training Venue Replication Specifications dated June 10, 2021, provided in electronic format via SAM, Contract Opportunities. Drawings: FLETC Venue Replication Drawings dated June 10, 2022, provided in electronic format via SAM, Contract Opportunities. Supplementary Documents and Appendices: provided in electronic format via SAM, Contract Opportunities. Wage Determinations: SC20220023 Building, dated 02/25/2022, SC20220041 Heavy, dated 02/25/2022, and Executive Order 14026 provided in electronic format via SAM, Contract Opportunities. Disclosure of Magnitude: Over $10M Description of the work: Base Item: New Training Venues at the FLETC Training Delivery Point in Charleston, South Carolina. Provide all necessary supervision, labor, materials, transportation, equipment, permitting, and other necessary services to construct New Training Venues in accordance with Specifications and Drawings dated June 10, 2021. Work includes the overall site development, construction of buildings, streets, parking, landscaping, canopies, security fence and walkways within the areas of construction in accordance with the A&E design drawings and specifications. New Training Venues include: o Scenario Based Training Activity #1 Page | 14 o Scenario Based Training Activity #2 o OC Spray Area o FLETC Driver Training Classroom o Non-Emergency Vehicle Operations Skid Pad and Driving Range Bid Option 1 - Construction of Virtual Firing Range/Aircraft Countermeasures Building. Provide all necessary supervision, labor, materials, transportation, equipment, permitting, and other necessary services to construct Virtual Firing Range Building in accordance with Specifications and Drawings dated June 10, 2021. Bid Option 2 - Construction of Scrap/Recycling Building. Provide all necessary supervision, labor, materials, transportation, equipment, permitting, and other necessary services to construct Recycling Building in accordance with Specifications and Drawings dated June 10, 2021. NOTE: The government intends to award the complete construction project as presented in the A&E Design Package. However, based on proposals received and available funding, it may be necessary to award less than the full project. To prepare for that possibility, bid option 1, and bid option 2 were included to award as much of the project as available funding will allow. To reduce contractor risk and Government cost, the bid options will be awarded at initial award or within the 60-day proposal price period. If both bid options are not awarded within that timeframe, contractors are requested to include a monthly (30 days) cost increase for award after the 60-day proposal price period up to September 30, 2022. The monthly cost increase can be expressed in a dollar amount or percentage of each bid option price (included on the Price Proposal Form). The monthly costs are not evaluation factors. They will only be used to obtain additional funding, if required. Performance Period: The contract performance period is Approximately 540 calendar days after award of Task Order for the Base Item and all Bid Options. Completion required no later than November 30, 2023. Liquidated Damages: Liquidated damages in the amount of $889.00 per day will be assessed, if necessary, in accordance with Section F.2 of the contract. Insurance/Bonds: Please review Section H.3 of the contract for insurance requirements and Section L.18 of the contract for performance and payment bond requirements. Bid bonds are not required. Utilities: Refer to appropriate Specification Section SITE VISIT An organized site visit for the FLETC Training Venue Replication will be scheduled for (Wednesday) April 6, 2022, at 9:00am local time Charleston, SC. Offerors who wish to inspect the proposed work site shall meet with the Government Representatives at the scheduled time and place. The site visit is not Mandatory. Page | 15 Due to Federal Law Enforcement Training Centers (FLETC) Charleston, SC Campus being a secure facility, visitors to the Center must obtain a visitor's pass, which requires advance coordination. Attendees must provide the following information to the procurement office by email no later than two days in advance of the site visit to request Center access. Attachment 06, Visitor Access Request, FLETC Form 121-00-02. Point of contact for coordination site visit visitor's pass is Jerald Roper (Email jerald.l.roper@fletc.dhs.gov) Phone 843-566-8546 II. INSTRUCTIONS FOR SUBMITTING QUESTIONS REGARDING SOLICITATION Contractors are requested to review this Task Order Announcement as soon as possible upon receipt. If a contractor has any questions regarding the Task Order Announcement which require an answer from the issuing office, these questions shall be submitted, in writing via email to the Contracting Officer, Mr. Useba F. Ford, referencing section and paragraph of solicitation, to the Contracting Officer at useba.f.ford@fletc.dhs.gov. Contractors shall submit questions by 4:00pm Local Charleston, SC Time on April 11, 2022. Any questions submitted after this date may not be answered. III. SUBMISSION INSTRUCTIONS Email Proposals to useba.f.ford@fletc.dhs.gov. All proposals must be clearly identified as a proposal. Subject Line of each email shall start with: "Proposal, Training Venues, contractor's name, and email X of XX". If more than one email is sent ensure the number of emails is included. CLOSING DATE: Submit email proposals by 2:00PM ET on April 21, 2022, to ensure consideration. Proposals submitted after this date may or may not be evaluated at the discretion of the Contracting Officer. The Contracting Officer will consider such factors as whether acceptance will unduly delay award or is necessary to increase competition. The Contracting Officer will also consider when e-mails were sent and Page | 16 when the e-mails arrived at the Government point of entry. The completed proposal shall be submitted to Mr. Useba F. Ford, Contracting Officer, via email at useba.f.ford@fletc.dhs.gov. The technical and price proposal shall be separate attachments. Each electronic submission must be less than 10MB; submissions greater than 10MB will not be received due to system limitations. Proposals must be prepared in accordance with these submission instructions, providing all required information in the format specified. Failure of a proposal to comply with these general and specific submission instructions contained in this Task Order Announcement may be grounds for exclusion of the proposal from further consideration. All contractors have the option to opt-out of proposal submission. If the contractor decidesto opt-out, the contractor shall submit a statement via email to Mr. Useba F. Ford, useba.f.ford@fletc.dhs.gov informing the Contracting Officer of the contractor's intent NOT to submit a proposal

Post-Bid

Military

$10,000,000.00

Public - Federal

New Construction, Paving, Site Work

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Abbreviations and Acronyms, Definitions, Reference Standards, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Temporary Facilities and Controls, Construction Facilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Tree and Plant Protection, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Maintenance Data, Warranties, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Curing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Thermal Insulation, Vapor Retarders, Roofing and Siding Panels, Metal Wall Panels, Membrane Roofing, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Fire and Smoke Protection, Firestopping, Joint Protection, Joint Sealants, Acoustical Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Entrances and Storefronts, Aluminum-Framed Entrances and Storefronts, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Wall Finishes, Wall Coverings, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Directories, Signage, Interior Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Wall and Door Protection, Toilet, Bath, and Laundry Accessories
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Furnishings and Accessories, Bedroom Furnishings, Blankets, Rugs and Mats, Runners
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Scaffolding, Other Conveying Equipment, Facility Chutes
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, Vibration and Seismic Controls for Fire-Suppression Piping and Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Vibration and Seismic Controls for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Facility Storm Drainage, Roof Drains, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Vibration and Seismic Controls for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Dampers, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Control-Voltage Electrical Power Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Commissioning of Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Hooks, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment, Packaged Water Treatment, Packaged Water Treatment Plants

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
43
Bidding Soon
613
All Active Projects
215
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 7, 2022

February 2, 2023

img_map_placeholder

2000 Bainbridge Ave, North Charleston, SC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.