Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a mixed-use development in Las Vegas, Nevada. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; sidewalk / parking lot; and road / highway.
The City of Las Vegas (Owner) hereby invites qualified firms or individuals (Bidders) to submit Bids for Construction of an asphalt and concrete trail, drainage facilities, sidewalk connection, sidewalk ramp upgrades, fencing, signing, striping, trail lighting, and flashing beacons at Fort Apache and Grand Montecito. This project is funded by the State Transportation and Federal Enhancement Funds; certain Federal Regulations apply as specified herein. Estimate: $5,122,984 - $5,692,205 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Cutoff Date: 8/11/2021 05:30 PM (PT) LOCATION: The project consists of a shared-use path along 215 Beltway between Centennial Parkway and Grand Montecito Parkway. The overall project length is approximately 3.0 miles. SCOPE OF WORK: The work to be performed under this contract consists of the constructing an asphalt trail along the north side of the CC 215 from Centennial Parkway to Grand Montecito Parkway. Improvements include asphalt paving, drainage facilities for the trail, retaining wall, sidewalk connections and sidewalk ramp upgrades, fencing, trail lighting, trail signing, enhanced pedestrian crossings including rectangular rapid flash beacons (RRFBs), and ground cover improvements.
Bid Results
Roads / Highways
$5,328,213.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 2, 2021
November 3, 2021
I-215 West Beltway Trail, Las Vegas, NV
Related To This Project
Las Vegas, NV
--
Las Vegas, NV
--
Las Vegas, NV
Bid Date: Aug 02 2022
Las Vegas, NV
Bid Date: Jun 30 2022
Las Vegas, NV
Bid Date: Aug 03 2022
Las Vegas, NV
--
Las Vegas, NV
Bid Date: Aug 04 2022
Las Vegas, NV
Bid Date: Jun 16 2022
Las Vegas, NV
--
Las Vegas, NV
Bid Date: Jun 21 2022
Las Vegas, NV
Bid Date: Jul 29 2022
Las Vegas, NV
Bid Date: May 02 2022
Las Vegas, NV
Bid Date: Apr 13 2022
Las Vegas, NV
Bid Date: Jul 28 2022
Las Vegas, NV
Bid Date: Jul 28 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.