BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Charleston, South Carolina. Completed plans call for site work for a bridge / tunnel.

Project funded by Emergency Supplemental Historic Preservation Fund Grant from U.S. Dept of the Interior, National Park Service, administered by SC Dept of Archives & History. At Middleton Place, demolish and replace the existing mill pond outfall box culvert to river; and make internal & external repairs to the Old Mill masonry walls and foundation. Construction Cost Range: $200,000-$300,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The scope of work of this project is divided into two parts of work: 1. Part 1 - Old Mill Outfall Culvert Replacement: This scope of work shall include, but not necessarily be limited to, draining the existing ponds, install two temporary coffer dams, provide and operate a temporary bypass/dewatering pump system to maintain water level in the pond, the demolition and replacement of the existing rectangular concrete box culvert located east of the Old Mill. The work will include demolition of the existing culvert, installation of new connecting junction box structurer, a 24" diameter Mill Pond discharge pipe with control valve, a new 96 feet of 4'x4' reinforced concrete box culvert, from the mill pond outlet flume to the Ashley River, erosion control features, tree clearing, regrading and miscellaneous site repairs and appurtenances, vegetative (grassing) stabilization of disturbed areas not re-paved; and other associated work to provide usable, functioning facilities to the Owner. 2. Part 2 - Old Mill Building Maintenance Repairs: This scope includes internal and external structural repairs to the existing Mill building masonry walls and foundations. This includes masonry deconstruction and rebuild, crack and joint repairs, existing mortar joint cleaning and re-pointing, window and door caulk and repainting, and other repair work as indicated and noted in the documents.

Award

Bridges / Tunnels

$239,835.00

Public - State/Provincial

Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
57
Bidding Soon
564
All Active Projects
260
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2021

January 4, 2022

img_map_placeholder

4300 Ashley River Rd, Charleston, SC


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.