Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Turlock, California. Contact the soliciting agency for additional information.
As of August 11, 2022, an engineer for for this solicitation has been identified. A timeline for construction has not been determined. Closed solicitation has been included below for reference. ……………….. The City of Turlock (City) is accepting proposals from qualified firms to develop a plan to efficiently and effectively utilize Measure A tax revenue to rehabilitate all City of Turlock roads in need of repair within five years. All interested parties are required to submit proposals in accordance with the conditions and dates outlined in this Request for Proposals (RFP). The City is subscribed to StreetSaver, a pavement management software that models the current Pavement Condition Index (PCI) of all road segments in the City based on visual inspections of all City roads performed in 2013. City staff update StreetSaver condition data as improvement projects are completed which improve segments of the road network. As of this writing, StreetSaver calculates an average city-wide PCI value of 55 out of 100, which is 7 points lower than 2016. Based on an analysis provided by StreetSaver, the estimated construction cost to bring all roads within the City up to a PCI of at least 80 is $230,000,000. The existing decision tree developed and incorporated into StreetSaver is included as an attachment. Additionally, recent StreetSaver data and classification / PCI map can be found in the attachments. Prior to 2017, the City received approximately $2,900,000 annually from gas tax and federal grants for road maintenance purposes. Those funds were used for road maintenance ranging from staff costs for pothole repair and line striping maintenance to road rehabilitation construction projects. In 2017, Stanislaus County passed Measure L, a 1/2 cent sales tax measure specifically for rehabilitation of roads and the State of California implemented funding to California agencies for SB1. Together, both Measure L and SB1 have added approximately $4,900,000 annually to the City's budget for road rehabilitation for a total of $7,800,000 when taken together with the approximate $2,900,000 annual revenue from gas tax and federal grants. After expenditures for annual maintenance activities, approximately $4,900,000 is available for allocation to road rehabilitation projects. In November 2020, City of Turlock residents passed Measure A, a 3/4 cent sales tax measure for general City services. It is estimated that Measure A will generate an additional $11,000,000 annually for the City of Turlock. The City Council and the community have expressed that repairing the City's roads is a top priority. As part of the Fiscal Year 2021-2022 budget, the City Council unanimously approved allocating 50% of the fiscal year's Measure A revenue, projected at approximately $5,600,000, towards road rehabilitation. Questions with regard to submissions, process or proposals can be directed to: Nathan Bray, P.E., Interim Director of Development Services / City Engineer Development Services Department Engineering Division 156 South Broadway, Suite 150 Turlock, CA 95380 (209) 668-5599 x 4435 nbray@turlock.ca.us. The City reserves the right, without qualification, to: 1. Reject all proposals. The method of contractor selection has not been determined at this time.
Award
Roads / Highways
$230,000,000.00
Public - City
Service, Maintenance and Supply
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 12, 2022
Multiple Locations, Turlock, CA
Related To This Project
Turlock, CA
--
Turlock, CA
Bid Date: Jul 21 2022
Turlock, CA
Bid Date: Sep 08 2022
Turlock, CA
--
Turlock, CA
Bid Date: Jan 13 2022
Turlock, CA
Bid Date: Dec 06 2019
Turlock, CA
Bid Date: Aug 24 2022
Turlock, CA
Bid Date: Jul 08 2020
Turlock, CA
Bid Date: Jul 15 2021
Turlock, CA
--
Turlock, CA
--
Turlock, CA
Bid Date: Jun 09 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.