Renovation of a playground / park / athletic field in San Francisco, California. Completed plans call for the renovation of a playground / park / athletic field.

The National Park Service (NPS), San Francisco Maritime National Historical Park (SAFR), located in San Francisco County, California, has a requirement for the removal and replacement of ceiling tiles on the third floor of the Aquatic Park Bathhouse. This RFQ replaces RFQ 140P8622Q0007. The contractor shall provide all mobilization, labor, supervision, materials, equipment, transportation, site rehabilitation, clean-up, and demobilization. The scope of this project includes, but is not limited to: 1. Ceiling: removal of existing adhered ceiling tiles, removal of existing adhesive on plaster substrate, preparation of the plaster substrate for new adhesive, and installation of new adhered acoustic ceiling tiles. 2. The removal of light fixtures, exits signs and other equipment/fixture components as required for ceiling removal/installation, and the reinstallation of such fixtures or components. 3. The work also includes measures to protect the art murals from contact, overpaint or any damage. Removal of such measures, with out damage to the art murals is part of this scope. The Government intends to award a single, fixed price contract. Award selection will be made on a Best Value determination made after consideration of price and factors other than price (Technical capability and past performance)as listed in the Request for Quotation (see Section M). Per the requirements of FAR 36.204, the project range is estimated to be between $25,000 and $100,000. The North American Industry Classification System (NAICS) code for this requirement is 238390, with a corresponding size standard of $16.5 Million. This Request for Quote is a Total Small Business set-aside, pursuant to FAR Subpart 19.502-2. A SITE VISIT is scheduled on Friday, March 25, 2022 at 2pm PD. Contact the Contracting Officer's Representative Todd Bloch at (415) 298-4525 Email:todd_bloch@nps.gov. See Section L of the RFQ for more information. Submission of Quotes: Quotes shall only be accepted through electronic mail addressed to patty_payne@nps.gov. All quote documents required by this solicitation must be uploaded and received in their entirety no later than April 13, 2022 at 9:00 am PD. Quotes submitted by hardcopy shall not be accepted or considered. Legacy Doc #: NPS Period of Performance: 05/02/2022 to 05/20/2022. Product/Service Code: Z2QA Product/Service Description: REPAIR OR ALTERATION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE) Delivery: 05/20/2022 Administrative Contract Specialist: Patty Payne Phone: 559-565-3181 Email: patty_payne@nps.gov Contracting Officer: Liset Gomez Phone: 415-265-5650 Email: liset_gomez@nps.gov Requestor Name Todd Bloch Phone 415-298-4525 Email todd_bloch@nps.gov An organized site visit has been scheduled for Friday, March 25, 2022. Site visit time will be 2pm. Contractor should register for the site visit in advance by contacting Todd Bloch, Preservation Manager, San Francisco Maritime National Historical Park, (415) 298-4525 or todd_bloch@nps.gov. (c) Participants will meet at The Aquatic Bathhouse located at 900 Beach Street, San Francisco, CA 94109. For more detailed directions, please visit the San Francisco Maritime National Historical Park website: http://www.nps.gov/safr/planyourvisit/directions.htm Further questions regarding directions to the meeting location can be addressed to the project COR, Todd Bloch. L.10 - Instructions for the Submission of Offers and Other Information (a) GENERAL INFORMATION: (1) Submission of Quotations: Quotations shall only be accepted through electronic mail addressed to patty_payne@nps.gov. All Quotation documents required by this solicitation must be uploaded and received in their entirety no later than April 13, 2022 at 9:00am. Any offer received after 9:00 am Pacific Daylight Time will be considered late and will be handled in accordance with Federal Acquisition Regulation (FAR) Part 15. Quotations submitted by hardcopy shall not be accepted or considered. It is the responsibility of the contractor to verify that any emailed quote package has been delivered to and received by the Contracting Officer listed above on or before the closing date/time of the RFQ. (2) Modifications/withdrawals of previous offers may be made either by personal delivery, mail or email. Modifications/withdrawals of offers must be signed by an offerer's authorized agent. (3) The Governments evaluation of "equal" product requests will be made after contract award as part of the submittal review process (Reference FAR 52.236- 03). Wage Rates Davis-Bacon Wage Rates apply for this project and are attached to this solicitation (See Section J, Attachment 002). The project is located in San Francisco County, CA. 1 DESCRIPTION: The Aquatic Park Bathhouse Building, also known as the Maritime Museum Building and the Sala Burton Building, is a major component of the Aquatic Park National Historic Landmark District and is known for its unique integration of interior architectural elements and full height interior wall murals. The murals are considered nationally significant works of art. The third floor is a large, single room with a coffered ceiling comprised of large plaster beams and acoustic ceiling tiles. The space is approximately 115 feet long by 40 feet wide. There are light fixtures and exit signs mounted to the ceiling tile areas of the ceiling and various conduit and fire/security devices mounted to the plaster beams. LOCATION: The Aquatic Park Bathhouse Building is located at 900 Beach Street in the San Francisco Maritime National Historical Park in San Francisco, California. SCOPE OF WORK: A. Ceiling: removal of existing adhered ceiling tiles, removal of existing adhesive on plaster substrate, preparation of the plaster substrate for new adhesive, and installation of new adhered acoustic ceiling tiles. B. The scope includes removal of light fixtures, exits signs and other equipment/fixture components as required for ceiling removal/installation, and the reinstallation of such fixtures or components. C. The work also includes measures to protect the art murals from contact, overpaint or any damage. Removal of such measures, with out damage to the art murals is part of this scope. A. Contractor's examination of the site: 1. A pre-bid site visit will be scheduled during the solicitation phase. 2. All bidders are encouraged to attend the pre-bid site visit B. Before starting work, the Contractor shall verify and/or establish all existing conditions, dimensions, variation of wall plumb and square etc. at the site. Submit discrepancies discovered to Contracting Officer's Representative for interpretation before proceeding with associated work. C. Historic Fabric and Murals: The Third Floor walls and columns are decorated with murals painted directly on the plaster surfaces and the floor is a decorative terrazzo. These surfaces must be protected during all operations. D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work. 1. The existing ceiling tiles and tile adhesive have been tested for asbestos and none was detected, see included report. 2. Due to the age of the existing finishes (prior to 1978), the Contractor shall assume that lead containing paint is present in the area of work unless test results prove otherwise. Comply with current federal, state and local regulations concerning the waste characterization, handling, containerization, transport, and disposal of lead. 3. If materials suspected of containing hazardous materials are encountered, do not disturb; immediately notify Contracting Officer. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Playgrounds / Parks / Athletic Fields

$100,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
50
Bidding Soon
1,762
All Active Projects
747
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 13, 2022

May 2, 2022

img_map_placeholder

900 Beach St, San Francisco, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.