BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Palo Alto, California. Completed plans call for site work for a water / sewer project.

Over the past several years, Public Works Operations Maintenance group have compiled an ongoing list of storm drain pipes and structures that are in need of repair and/or replacement. Over time, the pipes have cracked due to age, tree roots, construction activities, etc. and in some cases, pipe material such as corrugated metal pipe (CMP) has rusted, rotted where there are holes in the pipes. Based on the condition of the pipe, if there are no holes or significant cracking, the storm drain pipe can be cured-in-place pipe (CIPP) lined to avoid trenching in the street while being able to preserve the existing pipe and extending its life. A storm structure such as a manhole or catch basin may need to be installed for some sections where pipes are CIPP lined since it requires 2 access points to perform CIPP lining, at both ends of the pipe. In the cases where the pipes that have holes and are cracked, a full replacement will be needed. Pipe replacement in the streets may require additional work such as striping, sidewalk, curb and gutter, and curb ramp due to the location of the existing storm drain pipes. There are existing pipes that are 10-inches that will need to be upsized to 12-inch per the Storm Drain Master Plan and storm drain design standards. Part of this project includes upsizing pipes to meet minimum design standards. Due to the upsizing of the pipes, the connected catch basins will have to be removed and replaced. In some cases, 10-inch siphon pipes will remain and will only be CIPP lined. Storm drain areas where they are only siphons is recommended to only be CIPP lined, as they are not connected to the storm drain system, their only function is to convey storm water from a high point to a low point for drainage. The purpose of rehabilitating and repairing the storm drain system is to reduce chances of flood risks by making sure that the storm system is properly maintained and functioning. Type of Award Lump Sum License Requirements Class A - General Engineering Contractor Liquidated Damages $500/Day Q&A Deadline 08/10/2021 1:00 PM (PDT) Pre-Bid Meeting No

Award

Water / Sewer

$1,250,923.00

Public - City

Site Work

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
78
Bidding Soon
1,534
All Active Projects
580
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 24, 2021

October 21, 2021

img_map_placeholder

Multiple Locations, Palo Alto, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.