BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Springdale, Arkansas. Completed plans call for site work for a bridge / tunnel; transportation facility; for outdoor lighting for a transportation facility; and for paving for a transportation facility.

The Project consists of the construction of approximately 1700 tons of asphalt pavement, and associated base and subbase courses, extension of a quadruple 10' x 7' box culvert approximately 140 feet, approximately 4,500 LF of taxiway lighting improvements, and associated electrical improvements as shown in the plans and specifications. Bids shall be accompanied by a bid security in accordance with the Instructions to Bidders. The successful Bidder must furnish Performance and Payment Bonds in accordance with the Contract Documents. All Bidders shall make good faith efforts, as defined by Appendix A of 49 CFR Part 26, Regulations of the Office of the Secretary of Transportation, to subcontract a minimum of 6.48% of the dollar value of the prime contract to small business concerns owned and controlled by socially and economically disadvantaged individuals DBE). Bidders must be licensed to perform work within the state of Arkansas. Federal Requirements for Federally Funded Projects. This Project is being partially funded under the Federal Aviation Administration (FAA) Airport Improvement Program (AIP). Contractors must comply with specific federally required provisions as listed herein and contained in the contract documents. The following federal provisions are incorporated in this solicitation by reference: Buy American Preference (49 USC 50101) Trade Restriction Certification (49 USC 50104, 49 CFR part 30) Disadvantaged Business Enterprise (49 CFR part 26) Davis-Bacon Requirements (2 CFR 200, Appendix II(D), 29 CFR Part 5) Procurement of Recovered Materials (2 CFR 200.322, 40 CFR part 247, Solid Waste Disposal Act) Debarment and Suspension (2 CFR part 180 (Subpart C), 2 CFR part 1200, DOT Order 4200.5) Lobbying and Influencing Federal Employees (31 USC 1352, 2 CFR part 200 Appendix II(J), 49 CFR part 20 Appendix A) Affirmative Action Requirement. 1. The Bidder's attention is called to the "Equal Opportunity Clause" and the "Standard Federal Equal Employment Opportunity Construction Contract Specifications" set forth herein. 2. The goals and timetables for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows: Timetables Goals for minority participation for each trade: 6.48% Goals for female participation in each trade: 6.90% These goals are applicable to all of the Contractor's construction work (whether or not it is Federal or federally assisted) performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, it shall apply the goals established for such geographical area where the work is actually performed. With regard to this second area, the Contractor also is subject to the goals for both its federally involved and non-federally involved construction. The SPRINGDALE MUNICIPAL AIRPORT COMMISSION, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 USC 2000d to 2000d-4) and the Regulations, hereby notifies all Bidders that it will affirmatively ensure that any Contract entered into pursuant to this advertisement, disadvantaged business will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Bids must remain in effect for 120 days after the bid opening date. Within 120 days from the bid date, the Owner may award the contract to the lowest responsive, responsible Bidder or reject any or all Bids for the Project. The SPRINGDALE MUNICIPAL AIRPORT COMMISSION reserves the right to reject any or all Bids, to waive irregularities in the Bids and bidding deemed to be in the best interests of the SPRINGDALE MUNICIPAL AIRPORT COMMISSION, and to reject nonconforming, nonresponsive, or conditional bids.

Award

Transportation Terminals

$3,492,209.00

Public - City

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
55
Bidding Soon
590
All Active Projects
256
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 24, 2021

October 25, 2021

img_map_placeholder

802 Airport Ave, Springdale, AR

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.