BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Sausalito, California. Completed plans call for site work for a water / sewer project.

Award Details Contract Award Date: May 10, 2022 Contract Award Number: 140P8622P0030 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: WWFKELCJ64N8 Contractor Awarded Name: DARCY & HARTY CONSTRUCTION,INC. Contractor Awarded Address: , CA 94124-3611 USA Base and All Options Value (Total Contract Value): $127505 This project is for the Construction of the Fort Baker Sewer and Manhole in Sausalito, CA - Golden Gate National Recreation Area. a. This project is a 100% Total Small Business Set-Aside. NAICS: 237110, Water and Sewer Line and Related Structures Construction, the small business size standard is $39.5 million. b. Award of this solicitation will result in a single award firm-fixed price contract. c. Onsite construction shall be executed within 10 calendar days of notice to proceed. d. IAW FAR 36.204(c), the magnitude of construction is between $100,000 and $250,000 e. See Section L and M for quote instructions. Questions shall be electronically sent to Mr. Alexander Salgado at alex_salgado@nps.gov. Questions are due on April 18,2022 @ 2:00PM Pacific Time. f. Quotes shall only be accepted through electronic mail addressed to alex_salgado@nps.gov. All quote documents required by this solicitation must be uploaded and received in their entirety no later than the closing due date/time of April 20, 2022 @ 2:00PM Pacific Time. Quotes submitted by hardcopy or SAM.gov shall not accepted or considered. The contractor shall provide all supervision, labor, materials and equipment necessary to complete the work as identified in the project. Legacy Doc #: NPS Delivery: 90 Days After Notice to Proceed Delivery Location Code: 0009060573 NPS, GOLDEN GATE NRA Bldg. 201, Fort Mason San Francisco CA 94123-1307 US. The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 days. The time stated for completion shall include final cleanup of the premises. Quotes must be submitted electronically by emailed message to alex_salgado@nps.gov. Quotes submitted by hard copy or SAM.gov shall not be accepted or considered. Questions regarding this solicitation must be submitted in writing to alex_salgado@nps.gov by April 18th, 2022 at 2:00PM Pacific Time. Answers will be provided in writing to the requestor if the answer is already within the RFQ, or provided in amendment(s) to the solicitation. The work of this contract is for the construction of Fort Baker Sewer Line and Manhole Project Location: 585-573 Kober Street, Sausalito, California 94965 at Fort Baker in the Golden Gate Natural Recreation Area, California. (Coordinates: 37.83861, -122.48111) Project Description: The purpose of this project is to upsize the existing Fort Baker Sewer Line and Manhole. The manhole is not draining fast enough for the incoming flow to exit, and the temporary handicaps placed on the pumps is not a permanent solution. This section of the sewage collection system captures all flow from Rodeo Beach to Fort Baker approximately 20,000 gallons daily in a normal summer condition and winter flows can reach over 80,000 gallons daily. The project location is near public water ways and a spill would affect natural resources immediately. The specific work items include but is not limited to, upsizing of the sewer line and manhole, demolition of existing manhole bench and reshape, bypass pumping, trenching through asphalt, excavation and patching of asphalt and base, and shoring. Bid Guarantee. (SEP 1996) a) Failure to furnish a proposal guarantee in the proper form and amount, by the time proposals are due, may be cause for rejection of the proposal. (b) The offeror shall furnish a proposal guarantee in the form of a firm commitment, e.g., proposal bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return proposal guarantees, other than proposal bonds-- (1) To unsuccessful offerors as soon as practicable after the contract award; and (2) To the successful offeror upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the proposal as accepted. (c) The amount of the proposal guarantee shall be 20 percent of the total proposal price, whichever is less. (d) If the successful offeror, upon acceptance of its proposal by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the offeror, the Contracting Officer may terminate the contract for default. (e) In the event the contract is terminated for default, the offeror is liable for any cost of acquiring the work that exceeds the amount of its proposal, and the proposal guarantee is available to offset the difference. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$127,505.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
81
Bidding Soon
1,819
All Active Projects
742
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 20, 2022

May 20, 2022

img_map_placeholder

585 Kober St, Sausalito, CA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.