Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 1, 2021 at 8:00 PM
Updated September 15, 2023
Renovation of a municipal facility in Kenner, Louisiana. Completed plans call for the renovation of a municipal facility.
Remove existing air conditioning and heating equipment from building and install new American Standard (or equal) 5-ton equipment. Hang new air handler unit with unistrut threaded rod from steel purlins. Fabricate & install necessary sheet metal duct work, drain pan and heat strip. Replace duct smoke detector, wall thermostat & outdoor disconnect box. Flush system with RX-11, pressurize with nitrogen, evacuate & recharge with -410A. City of Kenner personnel will perform removal & replacement of ceiling to gain access to air handler unit. The Contractor's Bid shall be accompanied by a certified check, cashier's check or bid bond in an amount equal to five percent (5%) of the Contractor's Bid as an evidence of good faith. The Contractor shall purchase and furnish performance and payment bonds each in an amount at least equal to one hundred percent (100%) of the Contract price, including but not limited to, the obligations for actual damages and liquidated damages, in accordance with the provisions in the Contract, regarding delay in completion of the Work within the Contract times, as security for faithful performance and payment of all Contractor's obligations under the Contract.
Bid Results
Municipal
$9,220.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 10, 2021
September 10, 2021
325 Williams Blvd, Kenner, LA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
