BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a civil project in New York, New York. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

Reconstruction and Improvements at Throgs Neck Waste Water Treatment Plant (WWTP) - Throgs Neck Pumping Station Questions due: 09/07/2021 The Contractor shall furnish all labor, materials, plant, power, light, heat, fuel, water, tools, appliances, equipment, supplies and other means of construction necessary or proper for performing and completing the Work in accordance with the Contract. The Contractor shall also obtain and pay for all required permits to complete the Work. Any labor, materials and equipment that have been omitted in the description of the Work, but that are necessary or proper for the completion of the Work, shall be furnished by the Contractor at its sole cost and expense. The Contractor shall protect the Work during construction, clean up the Site and maintain the Work until Final Acceptance. The Contractor shall perform all tasks and pay all costs of cutting, protecting, supporting, maintaining, relocating and restoring all surface, sub-surface, and/or overhead structures, and all other property, including, but not limited to, pipes, conduits, ducts, tubes, chambers, and appurtenances, public or private, in the vicinity of and at the Site of the Work (except that which by law, franchise, permit, contract, consent or other agreement, the owner thereof is required to protect, support, maintain, relocate or restore), repair the same if damaged and restore to their original condition all areas disturbed. The Contractor shall perform all tasks and pay all costs of protecting, supporting, maintaining, relocating, replacing and restoring street equipment owned by the City and under the jurisdiction of the New York City Department of Transportation ("NYCDOT"), whether attached to utility company structures or connected to the underground electrical distribution system, including installing suitable temporary lighting equipment when the maintenance of permanent equipment is not feasible. All work done in connection with street lighting shall be in accordance with the requirements of NYCDOT or, for projects outside the City of New York, a local Authority Having Jurisdiction ("AHJ") over such work.

Award

Water / Sewer

$51,177,731.00

Public - City

Demolition, New Construction, Site Work

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
462
Active Projects
239
Bidding Soon
4,565
All Active Projects
2,039
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.