BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Nashville, Tennessee. Completed plans call for the renovation of a educational facility.

PROJECT 1 consists of removing existing 400 Amp S&C Fault Fiter fuses in existing 4.16kV S&C PMH Switches and install new 5kV, SMU-20 fuses and associated fuse clips in their place. PROJECT 2 consists of cleaning inside switches. Provide corrosion protection on inside of switches. PROJECT 2 work shall occur during the same 8-hour outage for each switch as is scheduled for PROJECT 1 work. All 8-hour outages will be scheduled either after 5pm or on the weekends. A. PROJECT 1 1. Remove existing 400 Amp S&C Fault Fiter fuses in existing 4.16kV S&C PMH Switches and install new 5kV, SMU-20 fuses and associated fuse clips in their place. Fuse sizes to be replaced and their switch numbers are listed in Appendix A. 2. Contractor will have 8 hours per switch for fuse replacements, regardless of the number of fuses per switch to be replaced. All 8-hour outages will be scheduled either after 5pm or on the weekends. 3. Contractor shall work with TSU personnel to isolate each switch prior to fuse replacements and then to re-energize the switch after installation. 4. Fuse installation and associated outages will be coordinated with TSU at least two (2) weeks in advance. 5. 5kV Fuses that are removed shall be turned over to Owner. 6. Reference drawings E1.1, E1.2, and E1.3 are the Campus 4.16kV Campus Electrical Distribution drawings indicating Switch numbers and locations. 7. Reference drawings E2.1 and E2.2 are the Campus 4.16kV One-Line Diagrams with Switch numbers indicated. B. PROJECT 2 1. Clean inside switches listed in Appendix B per S&C recommendations. 2. Provide corrosion protection on inside of switches listed in Appendix B, using Loctite Extend Rust Neutralizer on the affected areas. 3. All loose dirt, paint, and rust must be removed by scraping, wire brushing, or sanding prior to application. 4. Project 2 work shall occur during the same 8-hour outage for each switch as is scheduled for Project 1 work.

Award

Educational

$182,093.00

Public - State/Provincial

Renovation

8

11

2

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
28
Bidding Soon
723
All Active Projects
308
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2021

September 24, 2021

img_map_placeholder

3500 John A Merritt Blvd, Nashville, TN

Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.