Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Braintree, Massachusetts. Completed plans call for the renovation of a 145,850-square-foot, two-story above grade educational facility.
As of January 2022, site mobilization is under way. Open invitation to bid for Elevators only. GCs & all other filed sub-bid trades must be prequalified to bid & listed on,"Braintree New South Middle School Prequalified General Contractors and Trade Contractors The Town of Braintree, the Awarding Authority, invites sealed bids from Prequalified General Contractors for the New South Middle School, 232 Peach Street, Braintree, MA 02184 . Site preparation and construction of a new 2-story, 145,850 sf school building on the site of and adjacent to the existing operating South Middle School, including site development, parking facilities, and recreation field. The work is estimated to cost $72,331,417 (including all alternates). Phase 1A - October 12, 2021 - April 22, 2022 Major Construction Components: o Construction of a new temporary construction access road from Peach Street to the proposed new building foundation area. o Relocate rapid flashing beacon equipment, crosswalk and add a sidewalk ramp at Peach St. o Relocate an existing hydrant on Peach St. o Construct a temporary sidewalk with concrete barrier protection at the west side of the existing bus loop and transition temporary sidewalk into the existing sidewalk and plaza at the existing building main entry. o Construction of utilities from connection points at Kenmore Rd to the proposed new building, construction of utilities from connection points on Peach Street and Celia Rd that must pass through the existing occupied school area, construction of electrical and tele-comm duct bank(s), and construction of infiltration system #1 including top cover and asphalt binder for infiltration system #1 and including parking areas to connect to Kenmore Rd. Phase 1B - April 22, 2022 - May 31, 2023 Major Construction Components: o Construction of new building including completion of Certificate of substantial completion and Certificate of Occupancy unrestricted. o Construction of all site work, utilities, and site improvements within the Phase 1 construction area. Phase 2 - June 16, 2023 - August 18, 2021 Major Construction Components: o Removal/demolition of (2) classroom modular units including all foundations, modular unit assemblies, and exterior stairs or ramps connected to the modular classroom units, removal and proper termination of all utilities connected to the modular classroom units and make safe and weather tight the existing school building at the existing connection points to the modular classroom units. o Construction of all site work and site improvements within the areas of the existing school occupied areas, including but not limited to grading and landscape to tie new playing/recreation field, sidewalks, and landscape to existing to remain landscape and sidewalks, re-paving the existing east parking lot, new school driveway from Peach St. to the parent drop off/pick up zone, repairs/reconstruction of the existing school bus loop and associated sidewalks, relocation of the rapid flashing beacon device, cross walk, and sidewalk ramp at Peach St., relocation of a fire hydrant at Peach St., removal of the construction access road from Peach St. to the construction site, and all site work and site improvements related to the above described scope of work.
Award
Educational
$66,700,700.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 7, 2021
January 31, 2022
232 Peach St, Braintree, MA
Related To This Project
Braintree, MA
Bid Date: Nov 18 2021
Braintree, MA
Bid Date: Jan 24 2022
Braintree, MA
Bid Date: Jan 27 2022
Braintree, MA
Bid Date: Feb 24 2022
Braintree, MA
--
Braintree, MA
Bid Date: Jul 07 2021
Braintree, MA
Bid Date: Mar 10 2022
Braintree, MA
Bid Date: Jun 30 2021
Braintree, MA
Bid Date: Sep 28 2023
Braintree, MA
--
Braintree, MA
Bid Date: Sep 08 2023
Braintree, MA
Bid Date: Sep 20 2023
Braintree, MA
Bid Date: Sep 20 2023
Braintree, MA
Bid Date: Sep 20 2023
Braintree, MA
Bid Date: Sep 06 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.