BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Braintree, Massachusetts. Completed plans call for the renovation of a 145,850-square-foot, two-story above grade educational facility.

As of January 2022, site mobilization is under way. Open invitation to bid for Elevators only. GCs & all other filed sub-bid trades must be prequalified to bid & listed on,"Braintree New South Middle School Prequalified General Contractors and Trade Contractors The Town of Braintree, the Awarding Authority, invites sealed bids from Prequalified General Contractors for the New South Middle School, 232 Peach Street, Braintree, MA 02184 . Site preparation and construction of a new 2-story, 145,850 sf school building on the site of and adjacent to the existing operating South Middle School, including site development, parking facilities, and recreation field. The work is estimated to cost $72,331,417 (including all alternates). Phase 1A - October 12, 2021 - April 22, 2022 Major Construction Components: o Construction of a new temporary construction access road from Peach Street to the proposed new building foundation area. o Relocate rapid flashing beacon equipment, crosswalk and add a sidewalk ramp at Peach St. o Relocate an existing hydrant on Peach St. o Construct a temporary sidewalk with concrete barrier protection at the west side of the existing bus loop and transition temporary sidewalk into the existing sidewalk and plaza at the existing building main entry. o Construction of utilities from connection points at Kenmore Rd to the proposed new building, construction of utilities from connection points on Peach Street and Celia Rd that must pass through the existing occupied school area, construction of electrical and tele-comm duct bank(s), and construction of infiltration system #1 including top cover and asphalt binder for infiltration system #1 and including parking areas to connect to Kenmore Rd. Phase 1B - April 22, 2022 - May 31, 2023 Major Construction Components: o Construction of new building including completion of Certificate of substantial completion and Certificate of Occupancy unrestricted. o Construction of all site work, utilities, and site improvements within the Phase 1 construction area. Phase 2 - June 16, 2023 - August 18, 2021 Major Construction Components: o Removal/demolition of (2) classroom modular units including all foundations, modular unit assemblies, and exterior stairs or ramps connected to the modular classroom units, removal and proper termination of all utilities connected to the modular classroom units and make safe and weather tight the existing school building at the existing connection points to the modular classroom units. o Construction of all site work and site improvements within the areas of the existing school occupied areas, including but not limited to grading and landscape to tie new playing/recreation field, sidewalks, and landscape to existing to remain landscape and sidewalks, re-paving the existing east parking lot, new school driveway from Peach St. to the parent drop off/pick up zone, repairs/reconstruction of the existing school bus loop and associated sidewalks, relocation of the rapid flashing beacon device, cross walk, and sidewalk ramp at Peach St., relocation of a fire hydrant at Peach St., removal of the construction access road from Peach St. to the construction site, and all site work and site improvements related to the above described scope of work.

Award

Educational

$66,700,700.00

Public - City

Renovation

Subscribe For Documents

90 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
278
Active Projects
149
Bidding Soon
2,606
All Active Projects
1,050
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 7, 2021

January 31, 2022

img_map_placeholder

232 Peach St, Braintree, MA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.