Demolition, site work, paving, outdoor lighting and new construction of a bridge / tunnel in Chicago, Illinois. Design plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for outdoor lighting for a bridge / tunnel; and for paving for a bridge / tunnel.

As of August 22, 2022, an engineer has been selected. The stage of design has not been determined. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultant the Prime Consultant will be using are scheduled to attend an initial meeting on October 25, 2021 at 10:00 AM at the Region One/ District One Office in Schaumburg. Phase II engineering services are required for the improvements of Leavitt Street and Ashland Avenue bridge structures over I-290 (Eisenhower Expressway). The Consultant's work is expected to consist of preparing contract plans, specifications, and estimates for the bridge superstructure replacement of the existing Leavitt Street and Ashland Avenue Bridges over the Eisenhower Expressway (I-290). The Consultant's work may include topographic survey, drainage design, bridge and approach roadway design, underpass lighting, traffic signal modernization and interconnect as well as other structural tasks as determined by the department. The proposed improvement will consist of replacement of the existing bridge superstructures, parapets, and approach slabs under a full detour for Leavitt Street and staged construction for Ashland Avenue in addition to substructure repairs and all other incidental work required to complete Phase II contract plans. The completion date for this contract will be 18 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Structures (Highway: Typical) Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - RFQ Engineering - FAI 290 (Eisenhower Expressway) at Leavitt Street and Ashland Avenue Structures, Phase II Project *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Design

Bridges / Tunnels

$21,140,000.00

Public - State/Provincial

Demolition, New Construction, Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
179
Active Projects
91
Bidding Soon
1,811
All Active Projects
795
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.