BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and remodeling of a clubhouse / community center in West Linn, Oregon. Completed plans call for the remodel of a 38,333-square-foot clubhouse / community center; and for site work for a clubhouse / community center.

his project generally consists of building remodeling and site work improvements, including utility work, concrete, demolition, framing, masonry, carpentry, finishing, plumbing, mechanical, and electrical work. The City shall consider no bid unless the bidder is registered with the Oregon Construction Contractor Board and the bidder has complied with all prescribed public bidding procedures and requirements. The City of West Linn reserves the right to reject any or all bids, to postpone the award for 90 days, to delete certain items from the proposal, and to award the contract to the lowest responsive, responsible bidder. All construction contracts shall be accompanied by a bid guaranty. No bid for construction will be considered unless accompanied by a certified check, cashier's check, or a bid bond for an amount not less than ten percent (10%) of the aggregate amount of the bid by a surety company authorized to issue such bonds in the State of Oregon. It shallbe payable to the City of West Linn as a guaranty that the bid shall be irrevocable for a period of sixty (60) calendar days,unless otherwise specified, after the bid opening date and time and as liquidated damages should the Bidder fail or neglect to furnish the required performance bond and insurance and execute a contract within ten (10) calendar days after receiving said contract from the City for execution. The City will hold all bid security during the evaluation process. As soon as is practicalafter the completion of the evaluation, the City will issue a contract award notice for those Bids accepted by the City and return all checks to those who have not been issued a contract award notice. All bid security from contractors who have been issued an award notice shall be held until the successful execution of all required contractual documents and bonds (performance bond, insurance, etc.). If the contractor fails to execute the required contractual documents and bonds within the time specified, orten (10) days after notice of award if no period is specified, the contractor may be found to be in default and the contract terminated by the City. In case of default, the City reserves all rights inclusive of, but not limited to, the right to purchase material and/or to complete the required work in accordance with the City of West Linn Procurement Policy and to recover any actual excess costs from the contractor. Collection against the bid security shall be one of the measures available toward the recovery of any excess costs. The contractor shall be required to furnish non-revocable security binding the contractor to provide faithful performance of the contract in the amount of 100% of the total contract price payable to the City of West Linn.Performance security shall be in the form of a performance bond, certified check or cashier's check. This security must be in the possession of the City within the time specified or ten (10) days after notice of award if no period is specified. If the contractor fails to execute the security document as required, the contractor may be found in default and the contract terminated by the City. In case of default the City reserves all rights. All performance bonds shall be executed on the Performance Bond form included in the Bid Document, duly executed by the Bidder as Principal and having as Surety thereon a Surety company approved by the owner and holding a Certificate of Authority to transact surety business in the State of Oregon, by the Oregon Department of Insurance. Individual sureties areunacceptable. All Insurers and Sureties shall have at the time of submission of the proposal an A.M. Best's Key Rating Guide of "A-" or better as currently listed in the most recent Best Key Guide, published by the A.M. Best Company, payable without condition to the Owner. The contractor shall be required to furnish non-revocable security for the protection of all persons supplying labor and material to the contractor or any subcontractor for the performance of any work related to the contract. Payment security shall be in the amount of 100% of the total contract price and be payable to the City of West Linn.Payment security shall be in the form of a payment bond, certified check or cashier's check.All payment bonds shall be executed on the Payment Bond form included in the Bid Document, duly executed by the Bidder as Principal and having as Surety thereon a Surety company approved by the owner and holding a Certificate of Authority to transact surety business in the State of Oregon, by the Oregon Department of Insurance. Individual sureties are unacceptable. All Insurers and Sureties shall have at the time of submission of the proposal and A.M. Best's Key Rating Guide of "A-" or better as currently listed in the most recent Best Key Guide, published by the A.M. Best Company, payable without condition to the Owner. Time of Completion: 150 calendar day

Post-Bid

Clubhouse / Community Centers

$700,000.00

Public - City

Remodeling, Site Work

32

9

12

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
62
Bidding Soon
1,110
All Active Projects
410
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2022

March 25, 2022

img_map_placeholder

3706 Cedar Oak Dr, West Linn, OR

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.