BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Cherokee, Iowa. Completed plans call for the renovation of a educational facility.

Interior demolition and renovation of a portion of the former conference center on the Western lowa Tech - Cherokee campus to expand their Nursing Department. Contract Scope: demolition and renovation. Contract Terms: Lump sum (fixed price, stipulated sum). Notice to Proceed: Within 30 days after due date. Bids May Not Be Withdrawn Until: 30 days after due date. Required Substantial Completion Date: Not later than June 15, 2022. Completion date is critical due to requirements of Owner's operations. The Owner reserves the right to change the schedule or terminate the entire procurement process at any time. Bids shall be accompanied by a security deposit as follows: Bid Bond of a sum no less than 10 percent of the Bid Amount on AIA A310 Bid Bond Form. Cerified check or cashiers check in the amount equal to 10% of the Bid Amount. Bid Security must be filed in a separate envelope. Contractor and Owner recognize that time is of the essence as stated above and that the Owner will suffer financial and other losses if the Work is not completed and Milestones not achieved with the times specified in Paragraph 1.04 above, plus any extensions therof allowed in accordance with the Contract. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated dames for delay (but not as a penalty), Contractor shall pay Owner $500.00 for each day that expires after the time specified in Paragraph 1.04 above for Substantial Completion until the Work is substantially complete. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by Owner, Contractor shall pay Owner $500.00 for each day that expires after the time specified in Paragraph 1.04 above for completion and readiness for final payment until the Work is completed and ready for final payment.

Award

Educational

$500,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
16
Bidding Soon
223
All Active Projects
118
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 24, 2021

September 23, 2021

img_map_placeholder

200 Victory Dr, Cherokee, IA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.