BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 20, 2022 at 8:00 PM

Updated October 24, 2023

Renovation of a water / sewer project in Hollister, California. Working plans call for the renovation of a water / sewer project.

**As of May 20, 2022, project will rebid in 3-4 months.** The work for the North Fork Dam Spillway Repair Project (Project) generally includes the following components and facilities. Demolition and removal of the damaged areas of the North Fork Dam Spillway. Reconstruction of Spillway, including installation of soil backfill, compaction, installation of riprap, application of sack slurry with fibermesh cap. Crackfilling on existing Spillway areas and joints. Removal of vegetation on Spillway face. Questions regarding the Project may be addressed in writing or email to San Benito Engineering, Attn: Anne Hall, 502 Monterey Street, Hollister, CA 95023; ahall@sanbenitoeng.com

Final Planning

Water / Sewer

$408,000.00

Public - City

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
308
Active Projects
124
Bidding Soon
2,061
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2022

November 20, 2022

Project location map

To Be Determined, Hollister, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.