Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in South San Francisco, California. Completed plans call civil work for a road / highway and sidewalk / parking lot.
General work description: The work consists of traffic control; excavation; removals; hot mix asphalt paving; slurry seal; concrete curb, gutter, and paving; pervious concrete paving; signing and striping; utility adjustments; storm drainage modifications; bioretention planting and irrigation; and lighting modifications, located El Camino Real between Arroyo Drive and Kaiser Way in South San Francisco, CA. A detailed scope of work is included in the bid documents. The Contractor shall be responsible to furnish all labor, material, tools, equipment, incidentals and services necessary to complete all the work as specified and in accordance with the plans and specifications for the EL CAMINO REAL GRAND BOULEVARD III OBAG PROJECT, PROJECT NO. ST 1807, BID NO. 2658. At the time of contract award, the successful Bidder must be legally entitled to perform contracts requiring a Class A Contractor's license. Any Bidder or contractor not so licensed shall be subject to all penalties imposed by law including, but not limited to, any appropriate disciplinary action by the Contractors' State License Board. For Technical Questions Contact the Engineering Division Jeff Chou, PE, Senior Civil Engineer Jeffrey.Chou@ssf.net; (650) 829-6668 Submit Questions via the City's eProcurement Portal.
Bid Results
Roads / Highways
$3,214,557.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 26, 2023
March 27, 2023
El Camino Real, South San Francisco, CA
Related To This Project
South San Francisco, CA
Bid Date: Dec 20 2022
South San Francisco, CA
Bid Date: Nov 17 2021
South San Francisco, CA
--
South San Francisco, CA
Bid Date: Jan 05 2023
South San Francisco, CA
Bid Date: May 01 2020
South San Francisco, CA
--
South San Francisco, CA
--
South San Francisco, CA
--
South San Francisco, CA
--
South San Francisco, CA
--
South San Francisco, CA
--
South San Francisco, CA
--
South San Francisco, CA
--
South San Francisco, CA
--
South San Francisco, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.