BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Rochester Hills, Michigan. Completed plans call for site work for a water / sewer project.

East Avon Early Works Pipe Material Procurement for the 96-Inch Water Transmission Main Relocation Project Questions Due Date: Aug 24th 2021, 12:00 PM EDT General: The Summary of Work is a brief description of the Work to be provided by the Supplier. This summary is not intended to be a complete listing of the Work required for installation of the pipe materials The installation of the supplied pipe will be awarded to a Construction Manager At Risk (CMAR) Firm. The CMAR Firm will procure the installation through an open-book bidding process. The CMAR Firm or its subcontractor(s), collectively referred to herein as CMAR Firm, will install the pipe material. The Great Lakes Water Authority (GLWA) intends to assign the East Avon Early Works Pipe Material Contract to the CMAR Firm designated by GLWA. Supplier hereby consents to such contract assignment. Contract assignment to the CMAR Firm will occur in accordance with the milestone dates provided in this section Award CMAR Firm Contract (approximate) September 1, 2021 CMAR Firm to Solicit Bids and Submit GMP 1 (East Avon Early Works Package) to GLWA October 1, 2021 Issue Change Order to Accept GMP 1 (approximate) November 1, 2021

Bid Results

Water / Sewer

$2,843,263.00

Public - State/Provincial

Site Work

11

10

16

5

Subscribe For Documents

63 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
74
Bidding Soon
1,339
All Active Projects
535
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2021

January 10, 2022

img_map_placeholder

E Avon Rd, Rochester Hills, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.