Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 19, 2023 at 7:00 PM

Updated January 26, 2024

Site work for a bridge / tunnel in Chandler, Arizona. Conceptual plans call for site work for a bridge / tunnel.

As of January 19, 2023, the project has been cancelled. At this time, it has not been confirmed if the project will be rebid. The work consists of the removal of the existing Gilbert Road northbound roadway and low-water crossing, removal of the existing southbound roadway and bridge, the construction of the proposed Gilbert Road bridge at Salt River and roadway, including earthwork, asphalt pavement, curb and gutter, pedestrian sidewalk ramps, traffic signals, signing, pavement markings and drainage appurtenances. Q & A deadline: Jul 26, 2022 5:00:00 PM EDT

Project Abandoned

Bridges / Tunnels

$48,586,929.00

Public - County

Site Work

468

9

66

3

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
51
Bidding Soon
1,785
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 9, 2022

October 2, 2023

Project location map

S Gilbert Rd, Chandler, AZ

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed