Site work and paving for a mixed-use development in Milwaukie, Oregon. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Harvey Street from 32nd Avenue to 42nd Avenue is a two-way urban neighborhood greenway that runs west to east through the Ardenwald neighborhood. The roadway is an asphalt road with concrete curb and spotty non-ADA sidewalks. There are two driving lanes with parking and 6 curbs on both sides. The project will not include the intersection of 32nd Avenue and will proceed to the end of Harvey Street, and will branch onto 33rd Avenue, 36th Avenue, Sherry Street, 40th Avenue down to Drake Street, and 42nd Avenue all the way to Johnson Creek Boulevard. The roadway has average daily traffic of approximately 1,450 (City of Milwaukie, 2023) and serves as a primary for underground water transition and service mains. It is bordered by residential homes, multi-family residences, parks, and public utility buildings. The roadway is a school bus route. The existing pavement and curbs are in poor condition. The existing sidewalk is placed in short broken segments and does not meet ADA standards. UPDATE:https://www.milwaukieoregon.gov/sites/default/files/fileattachments/engineering/page/44571/capital_improvement_plan_2023-2028.pdf SAFE/SSMP Improvements: Harvey Street (32nd Avenue to 42nd Avenue) and 42nd Avenue (Howe Street to Harvey Street) replace or construct sidewalk and repave road. Create a neighborhood greenway along Harvey Street from 32nd Avenue to 42nd Avenue. Water Improvements: Harvey Street (36th Avenue to 40th Avenue) install 966 feet of 8-inch water mainline pipe. 33rd Avenue (Harvey Street to dead end) replace 470 feet of 4-inch water mainline pipe with 6-inch pipe. 36th Avenue (Harvey Street to dead end) replace 594 feet of 4-inch water mainline pipe with 6-inch pipe. Wastewater Improvements: General improvements through construction. Stormwater Improvements: treatement facilities will be installed as well as the replacement of storm sewer laterals as necessary. This project is included in the city's 2023-2028 Capital Improvement Plan (CIP). As of August 16, 2022, further details regarding design and construction have not been identified. __________________________________________________________________ Harvey Street SAFE/SSMP: Fill in sidewalk gaps on both sides of street, replace portions of existing sidewalk, and remove ADA barriers. Reconstruct roadway surface, install traffic calming improvements, and improve bicycle connections. Water System Improvements: Projects will include replacement of existing valves and reconnection of existing water services. Harvey Street: Replace approximately 2,500 feet and upsize various sections of 4-inch and 6-inch cast iron water main to 8-inch ductile iron pipe to improve fire flows and water quality in the neighborhood. 33rd Avenue: Replace approximately 470 feet and upsize the existing 4-inch water main to 8-inch ductile iron pipe to improve fire flows in the neighborhood. The new main will connect to the 12-inch water main on Harvey Street. 36th Avenue: Replace approximately 600 feet and upsize the existing 4-inch and 6-inch water main to 8-inch ductile iron pipe to improve fire flows in the neighborhood and may include the proper abandonment of the 2-inch line on Sherry Lane. The new main will connect to the 12-inch main on Harvey Street. Stormwater System Improvements: Roadway reconstruction triggers stormwater treatments which will include 4,000 sq ft of vegetated stormwater planters within the right-of-way. Wastewater System Improvements: Provide pipe stub out to right-of-way to Willamette Townhouse Apartments. As of August 13, 2021, this project is included in the City of Milwaukie's FY 2021-2026 CIP and construction is planned for FY 2022. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. Deadline for changes/clarifications/questions May 12, 2023 5:00 p.m. PST, Brandon Boutros, Associate Engineer, is the sole point of contact for this RFQ and may be reached at 503)786-7541 or BoutrosB@MilwaukieOregon.gov. All questions and clarifications for this RFQ must be addressed through the City's Bid Management System.
Post-Bid
Roads / Highways
$3,266,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 25, 2023
June 23, 2023
SE Harvey St, Milwaukie, OR
Related To This Project
Milwaukie, OR
Bid Date: Jul 11 2019
Milwaukie, OR
Bid Date: Apr 15 2019
Milwaukie, OR
Bid Date: Feb 21 2019
Milwaukie, OR
Bid Date: Jan 17 2019
Milwaukie, OR
Bid Date: Oct 23 2018
Milwaukie, OR
Bid Date: Dec 13 2018
Milwaukie, OR
Bid Date: Oct 11 2018
Milwaukie, OR
Bid Date: May 31 2023
Milwaukie, OR
Bid Date: Oct 26 2021
Milwaukie, OR
Bid Date: Feb 04 2020
Milwaukie, OR
Bid Date: Jan 10 2019
Milwaukie, OR
--
Milwaukie, OR
Bid Date: Sep 04 2019
Milwaukie, OR
Bid Date: Jul 09 2019
Milwaukie, OR
Bid Date: Apr 03 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.