Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, new construction, renovation and addition to a mixed-use development in Bel Air, Maryland. Completed plans call for the construction of a fire / police facility; for the addition of a fire / police facility; for the demolition of a fire / police facility; for the renovation of a fire / police facility; for site work for a fire / police facility; municipal facility; municipal facility; municipal facility; municipal facility; and municipal facility.
The last day which Contractors can ask questions in writing will be Thursday September 23rd. The Architect will only accept questions relating to addendum 4 until Friday September 24th at 2:00 pm local time. The Project consists of phased selective demolition of portions of the existing Bel Air Town Hall and Police Department and phased construction of additions and renovations to the existing facility. Furthermore, the building will remain in use will throughout construction. Active construction zones will be required to be partitioned off to maintain a safe working environment for the Police and Town administrative staff. Generally, the new construction consists of load-bearing masonry and steel, precast plank at the second-floor structure with structural steel and metal deck at the roof structure, masonry veneer, exterior metal wall panels, mechanically attached TPO membrane roofing, aluminum windows, storefront, casework, and interior finishes, along with the specified mechanical, electrical, plumbing and fire protection systems. Total Construction Estimate: 8.2 Million Approximate New Construction Building Area: 11,800 SF Approximate Renovations Building Area: 12,350 SF
Award
Municipal
$10,160,000.00
Public - City
Addition, Demolition, New Construction, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 29, 2021
November 29, 2021
Multiple Locations, Bel Air, MD
Related To This Project
Bel Air, MD
Bid Date: May 19 2022
Bel Air, MD
Bid Date: Jun 22 2022
Bel Air, MD
Bid Date: Jun 29 2022
Bel Air, MD
Bid Date: Jun 29 2022
Bel Air, MD
Bid Date: Jun 24 2022
Bel Air, MD
--
Bel Air, MD
Bid Date: Jun 08 2022
Bel Air, MD
Bid Date: May 20 2021
Bel Air, MD
Bid Date: Apr 13 2022
Bel Air, MD
Bid Date: Apr 29 2022
Bel Air, MD
Bid Date: May 25 2022
Bel Air, MD
Bid Date: May 25 2022
Bel Air, MD
Bid Date: Apr 06 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.