BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a transportation facility in Phoenix, Arizona. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

Project scope includes but is not limited to the following: 1. Taxiway - Past studies and the current CAMP plan ultimately plan for two new western Crossfield taxiways, Uniform and Victor. In the near term, a single taxiway is needed for operations, while the second one would be needed once a new west terminal is developed. This study will assess which should be constructed first. During the development of the PHX Sky Train(R), Uniform was assumed to be a Group VI taxiway while Victor was assumed to be Group V to set the Sky Train underpass structures. The Sky Train structures are now constructed, locking the horizontal alignment of the taxiways in place. It is noted that the taxiways are set to a Group VI separation and that both can be built a Group V width to accommodate operational needs since Group VI aircraft do not typically operate at Sky Harbor. For this study Taxiway widths are set at 214 feet to accommodate the Taxiway Safety Area for Group V, with actual usable width set at 75 feet with 30-foot shoulders. The taxiway profiles are set to match tie-in points at Taxiways Charlie and Delta, with a high point set over the roadway crossings to minimize the depression of the roadways crossed. Maximum taxiway grade will be 1.5% per FAA criteria. 2. Landside Roadways - the Taxiways cross over Buckeye Road and Sky Harbor Boulevard eastbound and westbound. The roadways will be crossed with a single continuous bridge structure for each taxiway that accommodates the roadway widths needed as well as space for utility corridors and incident management along the roadway shoulders. The roadway alignments and profiles are set to accommodate future development of the airport, including ADOT/MAG I-10 improvements, roadway security plazas, both planned taxiways and terminal development to the east. 3. Airside Roadways - Taxiways Uniform and Victor cross an existing north airside service road, and a future south airside service road. These crossings are recommended to be grade separated to eliminate service vehicles crossing an active taxiway. The south crossing will be accommodated by building out the Sky Train crossing structure to the south. The north crossing will be accommodated with a new structure and depressed roadway. As of June 18, 2024, Kiewit anticipates GMP 3 bidding sometime in 2025. Construction start for this package is anticipated for June 2024. Interested subcontractors should visit this page and begin the first steps process. https://www.kiewit.com/business-with-us/opportunities/taxiwayu/#FIRST-STEPS Construction Complete early/ mid 2027 Begin Taxiway Construction - January 2024

Under Construction

Transportation Terminals

$220,000,000.00

Public - City

Paving, Site Work

317

29

3

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
40
Bidding Soon
1,015
All Active Projects
433
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 2, 2024

June 3, 2024

November 19, 2027

img_map_placeholder

3400 E Sky Harbor Blvd, Phoenix, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.