BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 27, 2021 at 7:00 PM

Updated November 15, 2023

Demolition, site work and addition to a warehouse / distribution facility in Woodbury, Minnesota. Design plans call for the addition of a 4,100-square-foot warehouse / distribution facility.

The Environmental Center opened in 2009. Annual citizen participation and hazardous waste collected has more than doubled since the center opened. In 2016-2017, a Facility Assessment and Strategic Planning Study was completed by an architect. These modifications to the center are recommended in the study and will improve operational efficiency so that the center can continue to meet growth in participation, citizen demand, and waste volume, without compromising service, environmental management, or safety. The project scope includes facility expansion of 4,000 square feet to the storage building and adding three truck dock bays for loading. On December 14, 2021, the project was included in the approved 2022-2026 Capital Improvement Plan. Information regarding design firm and general contractor selection timeline has not been released. Construction is budgeted for FY 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Design

Warehouse / Distribution

$1,399,100.00

Public - County

Addition, Demolition, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
135
Bidding Soon
1,577
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2022

Project location map

4039 Cottage Grove Drive, Woodbury, MN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.