BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 17, 2025 at 7:00 PM

Updated January 18, 2025

Site work, paving and outdoor lighting for a civil project in Kissimmee, Florida. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.

As of January 17, 2025, a general contractor has been awarded and construction is underway. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 05 Selection Method : Letter of Response and Interview Sr 500 / Us 192 From I-95 to Sr 507 ( Babcock St ) TRC Members (Subject to Change) : Gabor Chiorean Heidi Trivett Will Isidort Sr 500 / Us 192 From I-95 to Sr 507 ( Babcock St ) - This Project Will Resurface This Segment of U.s. 192 to Extend the Life of the Existing Roadway. The Project Also Will Widen the Existing Bicycle Lane to a 6-foot-wide Buffered Bicycle Lane in Each Direction to Improve Safety for Bicyclists. Other Operational Improvements Include Extending Left Turn Lanes, Reconstructing Some Existing Median and Corner Curbs, and Upgrades to Traffic Signals. Pedestrian Safety Enhancements Include Adding New Pedestrian Crossings at the I-95 Interchange, as Well as New and Upgraded Crosswalks Throughout the Project Limits. The Project Also Will Reconstruct Pedestrian Curb Ramps to Current Americans With Disabilities Act (Ada) Standards and Upgrade Pedestrian Signals. Drainage and Lighting Improvements Are Also Planned. Financial Management Number(s) 447094-1 Shortlist Selection Date/Time 9/20/2021 Technical Review Committee Meeting 1 Date/Time 10/05/2021 Technical Review Committee Meeting 2 Date/Time 10/05/2021 Technical Review Committee Meeting 3 Date/Time 10/06/2021 Final Selection Date/Time 10/18/2021 07:00 pm Negotiations Period Begin Date 10/22/2021 Negotiations Period Ending Date 11/24/2021 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - SR 500 / US 192 From I-95 to SR 507 ( Babcock St )

Under Construction

Roads / Highways

$20,900,000.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
366
Active Projects
191
Bidding Soon
2,615
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2024

Project location map

US-192 & FL-500, Kissimmee, FL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.