Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 17, 2021 at 8:00 PM
Updated November 19, 2024
Site work for a water / sewer project in Hawkins, Texas. Completed plans call for site work for a water / sewer project.
Improvements and modifications to the Wastewater Treatment Plant (WWTP) shall include the following: 1. Demolition of the existing grit system and installation of new grit system equipment including grit chamber mechanical equipment, grit pump, grit dewatering equipment, piping, electrical and controls, and associated appurtenances. 2. Removal and replacement of two (2) Aeration Basin surface mounted aerators, electrical and controls, and associated appurtenances. Removal and replacement of Aeration Basin effluent weir gate and associated appurtenances. Removal and proper disposal of all water, sludge, sediment, grit, and debris from Aeration Basin. 3. Removal and disposal of all water, sludge, sediment, grit, and debris from Final Clarifier No. 1. Removal and replacement of Final Clarifier No. 1 mechanism, walkway assembly, platform, handrails, weir panels, scum baffles, anchors, electrical and controls, and associated appurtenances. 4. Removal and replacement of Sludge Digester surface mounted aerator, center pier, walkway assembly, platform, handrails, electrical and controls, and associated appurtenances. Removal and replacement of Sludge Digester telescoping valve and associated appurtenances. Removal and proper disposal of all water, sludge, sediment, grit, and debris from Sludge Digester. 5. Removal and replacement of influent lift station plug valves, check valves, and necessary piping and fittings. 6. Removal and replacement of return sludge pump station plug valves, check valves, and necessary piping and fittings. 7. Abandonment of existing chlorination building and installation of a new chlorination building, chlorine storage and feed equipment, drain line, chlorine gas feed line, electrical and controls, and associated appurtenances. Removal and replacement of chlorine gas induction unit, crane, electrical and controls, and associated appurtenances. Removal and replacement of two (2) Chlorine Contact Chamber influent sluice gates and two (2) Chlorine Contact Chamber effluent sluice gates. 8. Abandonment of existing standby generator and installation of a new standby generator, foundation, sidewalks, electrical and controls, and associated appurtenances.
Bid Results
Water / Sewer
$2,095,529.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 14, 2021
November 15, 2021
185 Co Rd 3300, Hawkins, TX
Related To This Project
Hawkins, TX
Bid Date: Feb 25 2025
Hawkins, TX
Bid Date: Sep 05 2025
Hawkins, TX
Bid Date: Feb 05 2026
Hawkins, TX
Bid Date: Sep 05 2024
Hawkins, TX
Bid Date: Jun 03 2024
Hawkins, TX
Bid Date: Aug 02 2023
Hawkins, TX
Bid Date: Feb 09 2023
Hawkins, TX
Bid Date: Feb 02 2023
Hawkins, TX
--
Hawkins, TX
--
Hawkins, TX
Bid Date: May 27 2022
Hawkins, TX
Bid Date: Mar 31 2022
Hawkins, TX
--
Houston, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
