BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and addition to a pre-engineered storage facility in Silver Lake, Kansas. Working plans call for the addition of a 19,000-square-foot pre-engineered storage facility; for the demolition of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

All contractors bidding as the prime bidder on this project must be pre-qualified with Office of Facilities and Property Management to bid this project. For instructions on pre-qualification go electronically. Due to the COVID-19 crisis, the Office of Procurement and Contracts in the Landon State Office Building located at 900 SW Jackson, Suite 451, Topeka, KS 66612 will be closed to the public until further notice. All modifications will need to be submitted by email to procurement@ks.gov. When making emailed modifications do not submit on Document C - Form of Bid. State only the add or deduct amount to be added or deducted to or from the base bid, alternate bid, or unit price. Do not give a new total price for the selection. Any changes to listed Subcontractors need to be listed on emailed modification as well Do not send Certificate of Tax Clearance in with emailed Modifications or as an emailed modification. If not submitted with original bid all bidders and major sub-contractors will have 48 hours after bid openings to submit Certificate of Tax Clearance. Official bid results shall be released when they are available. Bid Tabulations will be posted electronically Value: $250,000 to $500,000 ALLOWABLE AREAS: ALLOWABLE AREA S-1: 17,500 SF ALLOWABLE AREA B: 19,000 SF *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Managements acceptance, in 180 Calendar days (or less) following issuance of the written Notice to Proceed. A Public Works Bond as required by K.S.A. 60-1111 shall be furnished to the Owner by the Contractor in the amount of one hundred percent (100%) of the contract price

Final Planning

Warehouse / Distribution - Pre-Engineered Storage Building

$295,560.00

Public - State/Provincial

Addition, Demolition, Site Work

17

21

10

4

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
33
Bidding Soon
632
All Active Projects
281
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2021

April 1, 2022

img_map_placeholder

To Be Determined, Silver Lake, KS

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.