BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 21, 2021 at 8:00 PM

Updated January 26, 2024

Site work and paving for a sidewalk / parking lot in Tucker, Georgia. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of October 21, 2021. The project has been awarded with the amount of $175,867.50. The City of Tucker (City), requests that interested parties submit formal sealed bids/proposals to construct 5-foot-wide sidewalks along the south side of Church Street, from Lynburn Drive to 4th Street, along the north side of Church Street, from 4th Street to the entrance of the Hearthside Club at Tucker, and along the east side of Tucker Industrial, from the back entrance of 4535 Hugh Howell Road to Hirsch Drive. Some sidewalks will require the contractor to tie into existing sidewalks and related struc- tures. All sidewalks are to be constructed per specifications. The contractor shall execute the work according to and meet the requirements of the fol- lowing: The construction plans provided; Georgia Department of Transportation (GDOT) Specifications, Standards, and Details; The Contract Documents including but not limited to the scope of work, and specifications; City of Tucker ordinances and regulations; OSHA standards and guidelines; Any other applicable codes, laws and regulations including but not limited to Section 45-10-20 through 45-10-28 of the Official Code of Georgia Annotated, Title VI of the Civil Rights Act, Drug-Free Workplace Act, and all applicable requirements of the Americans with Disabilities Act of 1990. Pre-Bid Conference: None Questions on ITB 2021-015: Shall be submitted in writing via email to procurement@Tuckerga.gov. The deadline for questions is September 7, 2021, at 5 pm. The City reserves the right to reject any or all proposals, to waive informalities, and to re-advertise. The City of Tucker Procurement Department Award at Council meeting October 12, 2021 Proposed Completion Date February 18, 2022

Award

Sidewalks / Parking Lot

$175,868.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
227
Active Projects
95
Bidding Soon
2,039
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2021

October 15, 2021

Project location map

Multiple Locations, Tucker, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.