BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 20, 2024 at 8:00 PM

Updated August 21, 2024

Site work and paving for a civil project in Pasadena, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Reconstruction of Wafer Street from Harris Ave to Justification: This street was rated in poor condition and improvements Southmore Ave. Remove existing street and install new will enhance quality of life for the neighborhood and will concrete paving, curb and gutter sections with suitable size also help alleviate area flooding. storm water inlets at appropriate locations to drain the street. As of August 20, 2024, the project has been completed.

Occupancy

Roads / Highways

$2,221,666.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
400
Active Projects
227
Bidding Soon
3,766
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 14, 2023

Project location map

Wafer St, Pasadena, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.