BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in West Hartford, Connecticut. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and for outdoor lighting for a sidewalk / parking lot.

This non-recurring Capital Improvement Project provides the funding necessary to rehabilitate and improve New Park Avenue from Oakwood Avenue to New Britain Avenue. This project will improve the attractiveness, safety, and mobility for all users by incorporating traffic calming and complete street elements such as a travel lane reduction from 4 lanes (2 in each direction) to 3 lanes (1 in each direction with a center left turn lane). There will be a bike lane in each direction to connect New Britain Avenue, the Elmwood CT Fastrak bus station, the Trout Brook Trail, and many destinations along this corridor. In addition, the sidewalk areas will be improved with decorative street lighting, sidewalk material enhancements, wayfinding signage, and landscaping. Enhanced crosswalks will be incorporated and the traffic signals at the Talcott Road and Oakwood Avenue intersections will be replaced and include accessible pedestrian signal equipment with exclusive pedestrian phasing. The Community Development Department obtained two grant sources for this project: $2,000,000 from the Office of Policy and Management's 2017 Responsible Growth and Transit Oriented Development Grant $1,500,000 from the Department of Transportation's Local Transportation Capital Improvement Program. Town bond funding currently estimated at $100,000 will be required to cover costs exceeding the $3,706,000 grant funding. As of February 16, 2023, this project is in the early design phase with owner in-house staff. It is a anticipated construction will start mid 2024. This project is included in the Town of West Hartford's FY 2023-2034 CIP. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Roads / Highways

$3,806,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
491
Active Projects
290
Bidding Soon
4,635
All Active Projects
1,937
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2024

img_map_placeholder

New Park Ave, West Hartford, CT


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.