BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 2, 2021 at 8:00 PM

Updated March 26, 2026

Site work for a municipal facility in Green Bay, Wisconsin. Completed plans call for site work for a municipal facility.

In general, this this project includes (2) existing PK-1200 boilers, circa 1992, being replaced with (2) boilers, each with a minimum of 1,020 MBH output (85% efficient) at 180 degree leaving water temperature and 155 degree entering water temperature. New boilers shall be of similar physical size to fit the existing boiler footprint. Modifications to the rooms piping, venting, and electrical systems shall be made to accommodate boilers which vary in physical size/footprint or have differing vent and water connections from those on the existing boilers.

Post-Bid

Municipal

$100,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
59
Bidding Soon
580
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 7, 2021

October 7, 2021

Project location map

307 S Adams St, Green Bay, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.