Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Conroe, Texas. Completed plans call for site work for a water / sewer project.
The major items of work include: Rehabilitation of one 300,000-gallon galvanized Bolted Ground Storage Tank #2 and one 5,000-gallon Hydro Tank #1 each tank requires removal of existing interior coating and application of a new three coat epoxy coating system; sand blasting interior of both tanks; spot priming of localized exterior tanks and appurtenance corrosion; application of an epoxy overcoat. Each bid proposal must be accompanied by a Bid Bond from a reliable surety company drawn to the order of Lake Conroe Hill MUD in the amount of five percent (5%) of the total bid. No bid proposal may be withdrawn for a period of sixty (60) days after the bid opening date. OWNER reserves the right to reject any or all bids or to accept the bid deemed most advantageous to it. The successful bidder will be required to provide a performance, payment, and maintenance bond for the full amount of the contract. completion time of 60 days The successful bidder will be required to provide a performance, payment, and maintenance bond for the full amount of the contract. The anticipated start date will be the last week of October.
Award
Water / Sewer
$52,500.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 16, 2021
October 27, 2021
To Be Determined, Conroe, TX
Related To This Project
Conroe, TX
Bid Date: Sep 27 2018
Conroe, TX
Bid Date: Oct 05 2022
Conroe, TX
Bid Date: Oct 06 2022
Conroe, TX
Bid Date: Oct 04 2022
Conroe, TX
Bid Date: Oct 03 2022
Conroe, TX
Bid Date: Sep 27 2022
Conroe, TX
Bid Date: Dec 03 2020
Conroe, TX
Bid Date: Sep 15 2022
Conroe, TX
Bid Date: Oct 07 2022
Conroe, TX
Bid Date: Sep 16 2022
Conroe, TX
Bid Date: Oct 07 2022
Conroe, TX
Bid Date: Oct 06 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.