Renovation of a detention facility in Coxsackie, New York. Working plans call for the renovation of a detention facility.

**As of January 19, 2022 the project has been cancelled. The project will be rebid in the future.** Coxsackie Correctional Switchgear Contract term: 1 year Location: Coxsackie Correctional Facility 11260 Route 9W, Coxsackie, NY 12051 The primary power distribution system described below is comprised of (3) switchboards, Main Switchgear MSG-1, Normal/Emergency Switchgear MSG-2 and the Paralleling and Control Switchgear MSG-3. Each lineup of switchgear is rated 15kV max. voltage, 95kV BIL, 500MVA, 1200 Amp main bus, and 1200 Amp rating for each circuit breaker. The system is designed to operate at nominal 13,200 volts. The Main Switchgear MSG-1 contains (2) incoming utility main circuit breakers. The utility sources are designated PFS-1 & PFS-2 (utility#1 & utility#2). The utility sources are interlocked to allow only one of the sources to be connected at a time. The main switchgear MSG-1 distribution has (2) feeds to the Normal/Emergency Switchgear MSG-2, (2) feeds to Building 72 existing switchgear, and Feeder C. The (2) feeds to the normal/emergency switchgear are interlocked to allow only one of the feeds to be connected at a time. The feeds to building 72 will be interlocked with the existing generator circuit breaker so that utility power and generator power do not connect at the same time. The Normal/Emergency Switchgear is normally fed from the Main Switchgear MSG-1 via 1 0f 2 feeders. Loss of voltage sensing at the normal connection, with voltage available at the emergency connection will initiate an automatic changeover to the emergency connection. Automatic changeover will occur if a fault has occurred on the normal/emergency switchgear main bus as detected by the feeder protective relays. The Paralleling and Control Switchgear contains the circuit breakers, controls, and logic for (2) 820KW, 13,200V.3 phase, 60hz. Generators. The Paralleling and Control Switchboard interconnects to the Normal/Emergency Switchgear via a generator main circuit breaker. All system transfer controls and operator interface equipment is located in the Generator Control Switchboard.

Final Planning

Jails / Prisons

$1,700,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
220
Active Projects
127
Bidding Soon
1,911
All Active Projects
887
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2022

July 19, 2022

img_map_placeholder

11260 Rte 9W, Coxsackie, NY


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.