Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 6, 2021 at 8:00 PM

Updated September 24, 2026

Site work for a water / sewer project in Rio del Mar, California. Completed plans call for site work for a water / sewer project.

For furnishing all labor, materials, equipment, and services for the construction of improvements designated as: Cliff dr. & bayview dr. Main replacement project The work includes mobilization and demobilization and the procurement and installation of materials for approximately 3,400 feet of 6 & 8-inch-diameter potable water main by open-cut method. The work includes replacing and/or reconnecting 84 water services, fire services and fire hydrants. Twelve (12) tie-ins to existing water mains are included along with various appurtenances including combination air/vacuum valves and blowoffs. Santa Cruz County Public Works approved traffic control is required. Abandonment of all existing main connection fittings, valves, and other existing isolation valves as related to the main replacement is required. Contractor shall apply Type II slurry seal to Bayview Dr. within project limits The successful bidder will have 137 Working Days to substantially complete the project from the Notice to Proceed. Each bid shall be presented under sealed cover and shall be accompanied by a certified check or bidder's bond, made payable to the Owner, in an amount not less than ten percent (10%) of the bid. The said check or bidder's bond shall be given as a guarantee that the successful bidder will execute the contract in conformity with the form of agreement contained within the contract documents, and will furnish bonds and insurance policies as specified within ten (10) days after notification of the award of the Contract to the successful bidder. The contract documents that the successful bidder must submit within ten (10) days of notification of award include, but are not limited to, a payment bond in an amount of at least 100 percent of the amount payable by the terms of the project contract and that satisfies the requirements of California Civil Code Section 3248, and a performance bond in an amount of at least 100 percent of the amount payable by the terms of the contract, and a maintenance bond in an amount of at least ten (10) percent of the amount payable by terms of the contract. All project bonds must be executed by an admitted surety insurer in accordance with applicable law and acceptable to the Owner. Questions concerning this project should be submitted in writing via regular mail, email, or fax and directed to: fax and directed to: NAME: Michael J. Wilson, P.E., Associate Engineer Soquel Creek Water District ADDRESS: 5180 Soquel Dr Soquel, CA 95073 PHONE: (831) 475-8501 ext. 122 E-MAIL: michaelw@soquelcreekwater.org The Owner reserves the sole right to reject any or all bids and to waive any informality in a bid.

Award

$1,638,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
399
Active Projects
152
Bidding Soon
2,620
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2021

November 15, 2021

Project location map

Cliff Dr & Bayview Dr, Rio del Mar, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed