BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 16, 2024 at 7:00 PM

Updated February 17, 2024

Site work, renovation and addition to a detention facility in McKinney, Texas. Completed plans call for the addition of a 168,400-square-foot, three-story above grade detention facility.

Plans call for a three-story expansion to the adult detention facility totaling 168,400 square feet. The project is staged in three phases to keep the vehicle sally port in operation as long as possible. As of February 2024, a general contractor has been awarded. Construction is slated to commence March 2024. Contact the bidding GC(s) for access to the project documents and addenda, as the information has been classified as confidential in nature. Note from Sedalco Construction: ***PLEASE NOTE*** You will find references to Alternates 1, 2, 3, and 5 in the drawings. THESE ALTERNATES ARE TO BE IGNORED. Base bid is any area not labeled Alternates 1, 2, 3, 4/4a, or 5, and the only alternates that apply are indicated below and in Section 01 23 00 ALTERNATES: o Alt. 4/4a - Infirmary Remodel: Build-out of floor as indicated on Dwg. 1 on A231 - LEVEL 1 - FFMO/ADMIN & CLINIC FLOOR PLANS. o Alt. 6a - CPT3 Flocked Vinyl at base bid dayroom areas in lieu of polished concrete. o Alt. 7a - Terrazzo flooring and base at base bid showers and drying areas in lieu of epoxy. o Alt. 7e - Terrazzo flooring and base at Alternate 4 Infirmary Remodel area in lieu of epoxy. o Alt. 8a - Temporary chiller costs (monthly), including set up/take down to accommodate 310 TONS of cooling capacity. o Alt. 9 - Add 300' of 4 each 6" conduits for electrical and 300' of 4 each 4" conduits for data including 2 each 5' deep x 8' wide 2 hour rated vault enclosures (in the event existing power and data lines require relocation). Addendum #1-#7 have been issued as of 12-13-2023. Questions Deadline: 11/16/2023 05:00 PM (CT)

Award

Jails / Prisons

$114,452,019.00

Public - County

Addition, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
2
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 21, 2023

March 1, 2024

Project location map

4300 Community Ave, McKinney, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.