BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 16, 2022 at 7:00 PM

Updated November 27, 2025

Site work and paving for a bridge / tunnel in Corner Brook, Newfoundland. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Closing Time: 2:00 P.M. (NT) This project will consist of, but may not be limited to, the supply and placement of rock fill and reinforced concrete bottom slab and cut off walls complete with subdrains for the existing concrete box culvert. The supply and placement of reinforced concrete support wall sections complete with attachment dowels, concrete top beams and the supply and placement of galvanized steel beams will also be included. The project will also include for the demolition and removal of the existing adjacent reinforced concrete bridge, bank stabilization, guide rail upgrading, new guide rail installation and general site cleanup

Award

Bridges / Tunnels

$294,083.00

Public - City

Paving, Site Work

7

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
5
Bidding Soon
41
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2021

October 11, 2021

Project location map

Curling St, Corner Brook, NL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.