BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 27, 2022 at 8:00 PM

Updated September 15, 2023

Site work and new construction of a mixed-use development in Fort Worth, Texas. Completed plans call for the construction of a swimming pool; and for site work for a swimming pool.

The last day for questions from prospective Offerors is at 5:00 PM on Friday, May 19, 2022. The City will select the CMAR Contractor by using a two-step Request for Proposal (RFP) process. After evaluating the submitted Proposals from the CMAR Offerors, the City will shortlist and interview up to three Offerors. The City will then select and enter into negotiations with the Offeror. The City may discuss with the selected Offeror, options for a scope or time modification and any price change associated with such modification. The selected CMAR Contractor will provide Pre-construction Services including Constructability Reviews, Value Engineering Recommendations and Estimating Services Fees to review during the various phases of the design process. Once the construction documents are completed, the selected CMAR Contractor will provide a Guaranteed Maximum Price (GMP) and construction performance period for each of the three major portions of the work and all work combined. This GMP will be inclusive of Value Engineering and Estimating Services fees, General Conditions, Construction Manager's Fee, contingency, bonds, insurance, and other agreed upon costs; plus the City's General Contingency Allowance. The City of Fort Worth will negotiate on Pre-Construction Services Contract, with up to three phases and negotiate one Construction Services Contract with the selected CMAR firm determined to have made the Best Value offer. Refer to the "Forest Park Aquatics Center Proposal Form". The contract will include the following: Estimated Construction Budgets City's General Contingency Allowance (7.5%) for use by the OWNER only and any Allowance remaining at the end of construction will be retained by the OWNER. This Allowance will be included in the executed construction contract. Business Equity Firm Provisions Business Equity Goal: _25%__ Refer to the Special Instructions to Bidders documents for the Business Equity (M/WBE) Information. Business Equity participation will be evaluated in awarding this contract. The goal will be applied to the GMPs when the GMP agreements are reached. Offerors must submit an anticipated Business Equity Utilization Plan with their CMAR Proposal submittal. The selected CMAR Contractor will be required to provide Payment and Performance Bonds and provide Contractors General Liability and Statutory Workers Compensation Coverage once the GMP is agreed upon. For additional information contact the Project Manager, Ronald Clements, at (817) 392-8014 or email Ronald.Clements@fortworthtexas.gov for assistance. Or the Architect, Stephen Springs at (972) 960-9970 or ssprings@bsw-architects.com

Post-Bid

Swimming Pools

$5,000,000.00

Public - City

New Construction, Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
408
Active Projects
233
Bidding Soon
3,946
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2022

July 25, 2022

Project location map

2850 Park Pl Ave, Fort Worth, TX


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.