Site work and renovation of a transportation facility in San Antonio, Texas. Completed plans call for the renovation of a transportation facility; and for site work for a transportation facility.

Per the owner, as of November 2, 2021, an award for this solicitation has not yet been made. The owner states that an award is anticipated to be made in November 2021 before the Thanksgiving Holiday. Closed solicitation has been included below for reference. ............ Terminal Gates Expansion - B9, B1A, & A16 The consultant's construction estimated for this contract is: $15,766,000.00 BASE BID The project scope includes the additions of passenger boarding bridges at gate additions A16, B1A, and B9. Gate additions B1A and B9 will also include fixed walkways linking the PBB`s to the terminal building. Relocation of VSR striping from Gate A1 to B7, new and restriping of more than 10 gates at both Terminals A and B, and hold room renovations. New seating, finishes, millwork, signage, electrical, IT, security, civil, structural, mechanical, and plumbing sub-trades will be required for this scope. Gate B1A, specifically, will include the addition of 2,500 sf to the Terminal B building. The Project and the work of this Contract is divided among four components within Terminal A and B of the San Antonio International Airport and can be described in summary as follows: New A16 Gate Addition: This is generally located to the North of existing Gate A14 East of Gate A17 in Terminal A of the San Antonio International Airport. The scope also includes remodeling of the A14 and A17 area to accommodate the A16 Gate addition and holdroom seating. The work includes modification of the existing fleet mix apron striping associated with the new Gate A16, providing doors within the existing walls and curtain wall, and renovation of the electrical and data associated with the Holdroom. New B1A Gate Addition: The project is generally located between column lines 26 to 25 and column lines K to H, and column lines 27 to 26.2 in Terminal B of the San Antonio International Airport. The scope consists of a renovation and expansion of the Departure Level to create a new Gate B1A passenger holdroom. The scope includes the construction of a new Fixed-Walkway and Passenger Boarding bridge which will service a new Gate B1A aircraft parking position. New B9 Gate Addition: The project is generally located between column lines 26 to 22.6 and column lines Z to W, and column lines 26 to 22.6 and S.1 to T in Terminal B of the San Antonio International Airport. The scope consists of the construction of a new Passenger Boarding Bridge and Fixed Walkway with an adjacent Exterior Egress Stair for a new Gate B9, and the demolition of the existing concession in middle of the Hold Room for Gates B5, B6, B7, and B8. The scope also includes remodeling of the B5, B6, B7, and B8 Holdroom area to accommodate the B9 Gate addition. The work includes modification of the existing fleet mix apron striping associated with the new gate B9, providing doors within the existing walls and curtain wall, and renovation of the electrical and data associated with the Hold Room. VSR Realignment: The work items include the realignment of the Vehicle Service Road (VSR) from the northwest corner at Terminal B Gate B7 location to Terminal A Gate A1. The existing VSR will be shifted 81 feet from the existing taxi-lane centerline, from northwest to southeast corners. The shift from the southeast to the southwest corner will be of 112.5 feet from the existing taxi-lane. This work also includes mobilization, insurance and bonds, Airport safety and security, storm water pollution prevention, site preparation, unclassified excavation, construction surveying, staking and layout, all existing utility locating, protection of all existing utilities and facilities, and Contractor's quality control. ADD ALTERNATE #1: Terminal B SSCP LANE ADDITION New SSCP Lane Addition: At Terminal B, a new lane is proposed to be added to the security screening checkpoint. This will require the removal of the existing lobby wall adjacent to the checkpoint space, and a new wall to, generally match the existing, be constructed to enclose the additional space required for the new lane. This work will include upgrades to the existing HVAC system with a new AHU in an existing mechanical room, and ductwork along the roof above the Terminal B ticketing lobby. P/N - 223-1840-029, 18221 IES JOB NO: 1192730 Update.......The last day to submit questions / RFIs for the Terminal Expansion project has been extended. All questions are now due by 4:00PM CST Wednesday, 9/15/2021. Below is a link to the website to post your questions(s). https://www.civcastusa.com/project/612658b16e6bd54cab7686e1/questions Gate A16: New Gate (PBB) and Holdroom Renovation Gate B1A: New Gate (PBB w/ Fixed Bridge), Departure Level Holdroom Addition and Renovation. Gate B9: New Gate (PBB w/ Fixed Bridge) and Holdroom Renovation SSCP: Addition of TSA check lane and add AHU to accommodate new load.

Award

Transportation Terminals

$15,433,116.00

Public - City

Renovation, Site Work

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
27
Bidding Soon
2,133
All Active Projects
834
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2021

November 1, 2021

img_map_placeholder

9800 Airport Blvd, San Antonio, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.