Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a transportation facility in San Antonio, Texas. Completed plans call for the renovation of a transportation facility; and for site work for a transportation facility.
Per the owner, as of November 2, 2021, an award for this solicitation has not yet been made. The owner states that an award is anticipated to be made in November 2021 before the Thanksgiving Holiday. Closed solicitation has been included below for reference. ............ Terminal Gates Expansion - B9, B1A, & A16 The consultant's construction estimated for this contract is: $15,766,000.00 BASE BID The project scope includes the additions of passenger boarding bridges at gate additions A16, B1A, and B9. Gate additions B1A and B9 will also include fixed walkways linking the PBB`s to the terminal building. Relocation of VSR striping from Gate A1 to B7, new and restriping of more than 10 gates at both Terminals A and B, and hold room renovations. New seating, finishes, millwork, signage, electrical, IT, security, civil, structural, mechanical, and plumbing sub-trades will be required for this scope. Gate B1A, specifically, will include the addition of 2,500 sf to the Terminal B building. The Project and the work of this Contract is divided among four components within Terminal A and B of the San Antonio International Airport and can be described in summary as follows: New A16 Gate Addition: This is generally located to the North of existing Gate A14 East of Gate A17 in Terminal A of the San Antonio International Airport. The scope also includes remodeling of the A14 and A17 area to accommodate the A16 Gate addition and holdroom seating. The work includes modification of the existing fleet mix apron striping associated with the new Gate A16, providing doors within the existing walls and curtain wall, and renovation of the electrical and data associated with the Holdroom. New B1A Gate Addition: The project is generally located between column lines 26 to 25 and column lines K to H, and column lines 27 to 26.2 in Terminal B of the San Antonio International Airport. The scope consists of a renovation and expansion of the Departure Level to create a new Gate B1A passenger holdroom. The scope includes the construction of a new Fixed-Walkway and Passenger Boarding bridge which will service a new Gate B1A aircraft parking position. New B9 Gate Addition: The project is generally located between column lines 26 to 22.6 and column lines Z to W, and column lines 26 to 22.6 and S.1 to T in Terminal B of the San Antonio International Airport. The scope consists of the construction of a new Passenger Boarding Bridge and Fixed Walkway with an adjacent Exterior Egress Stair for a new Gate B9, and the demolition of the existing concession in middle of the Hold Room for Gates B5, B6, B7, and B8. The scope also includes remodeling of the B5, B6, B7, and B8 Holdroom area to accommodate the B9 Gate addition. The work includes modification of the existing fleet mix apron striping associated with the new gate B9, providing doors within the existing walls and curtain wall, and renovation of the electrical and data associated with the Hold Room. VSR Realignment: The work items include the realignment of the Vehicle Service Road (VSR) from the northwest corner at Terminal B Gate B7 location to Terminal A Gate A1. The existing VSR will be shifted 81 feet from the existing taxi-lane centerline, from northwest to southeast corners. The shift from the southeast to the southwest corner will be of 112.5 feet from the existing taxi-lane. This work also includes mobilization, insurance and bonds, Airport safety and security, storm water pollution prevention, site preparation, unclassified excavation, construction surveying, staking and layout, all existing utility locating, protection of all existing utilities and facilities, and Contractor's quality control. ADD ALTERNATE #1: Terminal B SSCP LANE ADDITION New SSCP Lane Addition: At Terminal B, a new lane is proposed to be added to the security screening checkpoint. This will require the removal of the existing lobby wall adjacent to the checkpoint space, and a new wall to, generally match the existing, be constructed to enclose the additional space required for the new lane. This work will include upgrades to the existing HVAC system with a new AHU in an existing mechanical room, and ductwork along the roof above the Terminal B ticketing lobby. P/N - 223-1840-029, 18221 IES JOB NO: 1192730 Update.......The last day to submit questions / RFIs for the Terminal Expansion project has been extended. All questions are now due by 4:00PM CST Wednesday, 9/15/2021. Below is a link to the website to post your questions(s). https://www.civcastusa.com/project/612658b16e6bd54cab7686e1/questions Gate A16: New Gate (PBB) and Holdroom Renovation Gate B1A: New Gate (PBB w/ Fixed Bridge), Departure Level Holdroom Addition and Renovation. Gate B9: New Gate (PBB w/ Fixed Bridge) and Holdroom Renovation SSCP: Addition of TSA check lane and add AHU to accommodate new load.
Award
Transportation Terminals
$15,433,116.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 1, 2021
November 1, 2021
9800 Airport Blvd, San Antonio, TX
Related To This Project
San Antonio, TX
Bid Date: Nov 09 2021
San Antonio, TX
Bid Date: Aug 04 2021
San Antonio, TX
Bid Date: Oct 19 2021
San Antonio, TX
Bid Date: Sep 23 2021
San Antonio, TX
Bid Date: Sep 29 2021
San Antonio, TX
Bid Date: Sep 23 2021
San Antonio, TX
Bid Date: Nov 11 2021
San Antonio, TX
Bid Date: Oct 05 2020
San Antonio, TX
Bid Date: May 01 2020
San Antonio, TX
Bid Date: Jan 08 2020
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
Bid Date: Jul 29 2022
San Antonio, TX
Bid Date: Sep 20 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.