Published June 21, 2022 at 8:00 PM
Updated November 15, 2023
Site work and new construction of a mixed-use development in Port Huron, Michigan. Design plans call for the construction of a fire / police facility; and for site work for a fire / police facility.
The City of Port Huron, Michigan desires to construct a new six-bay Central Fire Station at the present location of White Park. White Park is located on 10th Street between White and Chestnut Streets. This new station will combine operations at the Fire Department's current Central Station (515 River Street) and Station #4 (3114 24th Street). The City also requires minor improvements to Station #3 (1914 Sanborn Street) in order to accommodate an increase in assigned personnel and extend the building's life by a minimum of 10 years. The method of Contractor Selection has not been Determined at this time. The new Central Fire Station is estimated to be approximately 22,000 square feet in area including a six-bay apparatus room, equipment and personnel decontamination facilities, a training facility, living quarters for up to nine suppression personnel, and administrative offices for on-duty fire officers and one administrative training officer. Site requirements include parking spaces for 20 vehicles, drive-through apparatus bays, a training tower, and an outbuilding of approximately 2,500 square feet. A copy of a conceptual site plan prepared by Redstone Architects, Inc. in 2020 is attached to this RFQ. The space needs assessment, upon which the conceptual plans were developed, will be provided to the selected Firm. The selected Firm will need to conduct an updated and revised space needs assessment. The estimated construction budget for the building and site, including general conditions and contractor's overhead and profit, is estimated to be approximately $8,000,000 based on an early-2023 construction start. Soft costs for this project is estimated at $2,000,000, bringing the projected project budget to $10,000,000. Question Acceptance Deadline 10/20/2021 03:00 PM EDT Questions are submitted online No
Design
Sidewalks / Parking Lot
$8,000,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 20, 2022
10th St, Port Huron, MI
Related To This Project
Port Huron, MI
Bid Date: Dec 12 2018
Port Huron, MI
Bid Date: Oct 06 2023
Port Huron, MI
Bid Date: Oct 06 2023
Port Huron, MI
Bid Date: Oct 03 2023
Port Huron, MI
Bid Date: Oct 19 2023
Port Huron, MI
Bid Date: Nov 01 2023
Port Huron, MI
Bid Date: Nov 01 2023
Port Huron, MI
Bid Date: Nov 01 2023
Port Huron, MI
Bid Date: Mar 31 2022
Port Huron, MI
Bid Date: Mar 24 2022
Port Huron, MI
Bid Date: Mar 03 2022
Port Huron, MI
--
Port Huron, MI
Bid Date: Mar 10 2022
Port Huron, MI
Bid Date: Feb 07 2022
Port Huron, MI
Bid Date: Feb 17 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.