Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 4, 2022 at 7:00 PM

Updated September 15, 2023

Site work, paving and outdoor lighting for a mixed-use development in Murrieta, California. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

Warm Springs Parkway North Improvements The Warm Springs Parkway North Improvements consists of approximately 665 linear feet of roadway improvements on Warm Springs Parkway and median and paving improvements on Clinton Keith Road. Scope includes grading, roadway removals, new pavement and aggregate base, curb and gutter, sidewalk, drainage improvements, signing and striping, traffic control, raised median island, landscape and irrigation, traffic signal, street lighting, dry utilities, water and sewer utilities, and all other work required by the plans and specifications, all as shown on the Plans, Standard Plans, and as specified in the Bid Specifications. Bid Bond: 10.00% Payment Bond: 100.00% Performance Bond: 100.00% Online Q&A: Yes Q&A Deadline: 09/16/2021 2:00 PM (PDT) Pre-Bid Meeting: No Estimated Bid Value: $3,000,000 Project Duration: Ninety (90) working days

Award

Roads / Highways

$2,646,646.00

Public - City

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

77 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
755
Active Projects
294
Bidding Soon
4,987
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 22, 2021

November 22, 2021

Project location map

Multiple Locations, Murrieta, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed