Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 12, 2021 at 7:00 PM
Updated September 14, 2023
Site work for a water / sewer project in Pontiac, Michigan. Completed plans call for site work for a water / sewer project.
10,700 LFT of 8-inch HDPE SDR 11 Water Main installed via HDD 2,000 LFT of 8-inch DIWM CL54 Water Main installed via OC 70 LFT of 12-inch HDPE SDR 9 Water Main installed via HDD 40 LFT of 12-inch DIWM CL54 Water Main installed via OC 12,000 LFT Water Main Abandonment 44 Valve and Wells, 28 Hydrants, 17 Connections to Existing Water Main (6",8", and 12") 34,500 SYD of 2-inch Cold Milling Existing HMA Pavement (Base Bid) Alternate Bid of 4-inch Cold Milling Existing HMA Pavement and Full Depth HMA Removal (Varies by Street) Three Sanitary Sewer Open Cut Point Repairs and 625 LFT of 8" CIPP Lining Questions, comments, or concerns of any Bidder regarding bidding or the Contract Documents or the project, must be submitted in writing by no later than Monday, September 20, 2021 @ 5:00 PM local time. No inquiry received after this date/time will be given consideration. Submit all questions to (in writing) Engineer at: Jack Nagle, P.E. Hubbell, Roth & Clark, Inc. Email: jnagle@hrcengr.com Phone: 248-454-6397 A certified or cashier's check or bid bond for a sum not less than five percent (5%) of the amount of the proposal will be required for each proposal. Owner reserves the right to accept any proposal, to reject any proposal and to waive irregularities in the proposals. The Contractor must conduct operations so as to cooperate with and interfere as little as possible with activities of other contractors, utilities, or City of Pontiac staff on or near the project area in conformance with the General Conditions of the Contract Article 9 "Other Work - Coordination" and the General Specifications of the Contract Article 8 "Public and Private Utilities - Road Permits". This clause summarizes the currently known conflicts, cooperation and coordination to aid in the successful construction of the project.
Award
Water / Sewer
$6,291,803.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 30, 2021
November 22, 2021
Multiple Locations, Pontiac, MI
Related To This Project
Pontiac, MI
Bid Date: Jan 06 2023
Pontiac, MI
Bid Date: Oct 07 2022
Pontiac, MI
Bid Date: Jul 15 2022
Pontiac, MI
Bid Date: Feb 03 2022
Pontiac, MI
Bid Date: Mar 02 2022
Pontiac, MI
Bid Date: Jan 17 2023
Pontiac, MI
Bid Date: Feb 07 2023
Pontiac, MI
--
Pontiac, MI
Bid Date: Feb 04 2022
Pontiac, MI
Bid Date: Jun 17 2021
Pontiac, MI
Bid Date: Jul 29 2022
Pontiac, MI
Bid Date: Jul 29 2022
Pontiac, MI
Bid Date: Jul 28 2022
Pontiac, MI
Bid Date: Jul 22 2022
Pontiac, MI
Bid Date: Jun 30 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
