Published October 4, 2021 at 8:00 PM
Updated May 20, 2026
Site work and paving for a transportation facility in Pikeville, North Carolina. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.
Asphalt Apron Pavement Rehabilitation Wayne Executive Jetport. For information regarding this project please contact: Kristel Weldon Administrative Manager W.K. Dickson & Co., Inc. 720 Corporate Center Drive, Raleigh, NC 27607 Phone: 919-256-5601 Email: kweldon@wkdickson.com Each proposal shall be accompanied by a cash deposit or a certified check drawn on a bank or trust company insured by the Federal Deposit Insurance Corporation in an amount equal to not less than 5% of the proposal or a bid bond of 5% of the bid executed by a surety company licensed under the laws of North Carolina to execute such bonds. The deposits shall be made payable to the Owner and shall be retained by the Owner as liquidated damages in the event of the successful bidder fails to properly execute the contract within ten (10) days after award and to give satisfactory surety as required by law. By submitting a bid the Contractor certifies that he has under his direct control or at his disposal the men, equipment, and materials required to execute this work as specified. Lack of such control or availability of men, equipment or materials shall constitute failure to properly execute the Contract. Performance and Labor and Material Payment Bonds will be required for 100% of the Contract price, with a surety or sureties legally authorized to do business in the State of North Carolina. Bidders must be prequalified by the NCDOT prior to submitting a bid. Subcontractors performing work on this project must be prequalified prior to performing any work on this project. The Owner reserves the right to reject any or all bids and to waive informalities and minor irregularities. Contract Time: Base Bid: 150 Calendar Days Additive Bid No. 1: 10 Calendar Days Liquidated Damages: $1,000.00 per Calendar day overrun
Bid Results
Transportation Terminals
$2,462,716.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 30, 2021
November 1, 2021
240 Aviation Dr, Pikeville, NC
Related To This Project
Pikeville, NC
Bid Date: Dec 16 2025
Pikeville, NC
Bid Date: Dec 09 2025
Pikeville, NC
Bid Date: Jul 10 2025
Pikeville, NC
Bid Date: Jul 10 2025
Pikeville, NC
Bid Date: Feb 06 2025
Pikeville, NC
Bid Date: Dec 12 2024
Pikeville, NC
Bid Date: Feb 06 2025
Pikeville, NC
Bid Date: Feb 06 2025
RFP-2024 ARPA Water System Improvements Contract No. 29 - Advanced Metering Infrastructure - 5597424
Pikeville, NC
Bid Date: Dec 12 2024
Pikeville, NC
Bid Date: Oct 25 2024
Pikeville, NC
Bid Date: Sep 24 2024
Pikeville, NC
Bid Date: Sep 27 2024
Pikeville, NC
Bid Date: Oct 29 2024
Pikeville, NC
Bid Date: Mar 05 2024
Pikeville, NC
Bid Date: Dec 14 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.