BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Fort Wayne, Indiana. Working plans call for site work for a water / sewer project.

*As of 9/15/2021 this project has been cancelled. no rebid currently anticipated. Allen County Stormwater Improvement Project 10-021 Allen County Stormwater Improvement Project 10-0521 All questions must be in writing and submitted via email to Jack Krouse at Jack-K@cc-inc.net and Dawn.Rose@co.allen.in.us no later that 4pm on Monday, September 13, 2021. The bid shall also be accompanied by a bid bond in the amount of 5% of the bid A Performance Bond and Payment Bond in the amount of 100 % of the contract price shall be required upon notification of the successful bidder prior to signing of the contract. The Board of Commissioners of the County of Allen, Indiana reserves the right to reject any and all bids for failure to comply with applicable laws and reserves the right to waive irregularities. Scope of work is comprised of two projects (A & B) that can be bid individually or together. The plans have been developed by the Allen County Surveyor's office. Project A - Installation of storm pipes through the north/south "Bullet Barrier Mound" utilizing: Option #1 Two, 38"x24", Elliptical RCP Pipes or Option #2 Two, 36" Round RCP Pipes Only one Option can be used. They will also be required to create a "flow path" from the new pipes to the existing 48" CMP pipe that carries water to the detention pond through the east/west north bullet mound shown on sheet "OUT" 7 of 7. Additional work under Project A will be the installation of two new 12" RCP under the entrance drive shown on sheet PP1. All work will include the items shown on various appropriate sheets including but not limited to trash racks, removal of existing pipes, ditch profiling, concrete, erosion control blankets, stone, landscaping, surface remediation of the site, and entrance drive repairs after the work is complete. Project B - Installation of 24", new storm pipe on the west side of Adams Center Road, running north and south, and repair work where water eroded the adjoining banks. This will include all items shown on the drawings for a completed project. The installation of the pipe will involve the removal of several landscape items. Once the work is complete the owner will remediate this loss of trees and scrubs, understanding that every effort should be made to minimize the loss.

Final Planning

Water / Sewer

$400,000.00

Public - County

Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
57
Bidding Soon
559
All Active Projects
291
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2021

October 18, 2021

img_map_placeholder

Multiple Locations, Fort Wayne, IN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.