BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a laboratory facility in Long Beach, California. Completed plans call for the renovation of a laboratory facility.

License Requirements: The successful Bidders and subcontractors will be required to have current and active California Contractors Licenses at the time of submission of the Bid: Licenses required: B. Bid Security Required: 10% of the maximum amount of the Bid Proposal in the form of Bid Bond, Cash, or Certified or Cashiers Check. Bonds Required: Performance and Labor & Materials 100%. Pre-bid Inquiries due by September 27, 2021 before 10:00 a.m. The Pre-bid Inquiry Form is available on the District website under the project name. Email to Juan Santana at jsantana.bmt@lbcc.edu with a copy to bmorales@lbcc.edu & jbeltran@lbcc.edu and brazpoza@lbcc.edu. Prevailing Wage Monitoring & Enforcement: Pursuant to California Labor Code 1771.4(a)(4) the work is subject to payment of Prevailing Wage Rates. Every Contractor and all Subcontractors of every tier, performing any portion of the work, shall pay laborers not less than the Prevailing Wage Rate established for the labor provided. Prevailing Wage monitoring and enforcement shall be by the Department of Industrial Relations Upgrade control valves and pneumatic valves, replace all supply and exhaust lab valves. Replace reheat coils, upgrade controls to DDC and integrate into existing building DDC system. Replace fume hood controls and sensors with new DDC controls. Convert labs from constant volume to variable volume system for energy savings, provide power to new DDC controls and lab valves where required. And minor ceiling repairs where lab valves are replaced. Planned Duration: Eighty Three (83) calendar days. Trades Involved: Mechanical, Electrical, and Plumbing Substantial Completion 83 calendar days from NTP Punchlist Completion 14 calendar days from Substantial Completion Project Location: Long Beach City College, Liberal Arts Campus.

Award

Laboratories

$661,052.00

Public - City

Renovation

23

22

30

7

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
226
Active Projects
112
Bidding Soon
2,359
All Active Projects
1,052
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2021

June 9, 2022

img_map_placeholder

4901 E Carson St, Long Beach, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.